Element
EDIFACT EDI Release D09A
DTM
2005Date or time or period function code qualifier
Code qualifying the function of a date, time or period.
属性
数据类型ID
必须?Mandatory
长度Min 0 / Max 3
Codes (779)
  • 1Service completion date/time, actual
  • 2Delivery date/time, requested
  • 3Invoice document issue date time
  • 4Order document issue date time
  • 5Saleable stock demand cover period, expected
  • 6Moved from location date
  • 7Effective from date/time
  • 8Order received date/time
  • 9Processing date/time
  • 10Shipment date/time, requested
  • 11Despatch date and or time
  • 12Terms discount due date/time
  • 13Terms net due date
  • 14Payment date/time, deferred
  • 15Promotion start date/time
  • 16Promotion end date/time
  • 17Delivery date/time, estimated
  • 18Installation date/time/period
  • 19Meat ageing period
  • 20Cheque date/time
  • 21Charge back date/time
  • 22Freight bill date/time
  • 23Equipment reconditioning date/time, actual
  • 24Transfer note acceptance date and time
  • 35Delivery date/time, actual
  • 36Expiry date
  • 37Ship not before date/time
  • 38Ship not later than date/time
  • 39Ship week of date
  • 40Clinical information issue date and/or time
  • 41Event duration, expected
  • 42Superseded date/time
  • 43Event duration, intended
  • 44Availability
  • 45Compilation date and time
  • 46Cancellation date
  • 47Statistical time series date
  • 48Duration
  • 49Deliver not before and not after dates
  • 50Goods receipt date/time
  • 51Cumulative quantity start date
  • 52Cumulative quantity end date
  • 53Buyer's local time
  • 54Seller's local time
  • 55Confirmed date/time
  • 56Original authorisation date and/or time
  • 57Precaution relevant period
  • 58Clearance date (Customs)
  • 59Inbound movement authorization date
  • 60Engineering change level date
  • 61Cancel if not delivered by this date
  • 62Excluded date
  • 63Delivery date time, last
  • 64Delivery date/time, earliest
  • 65Delivery date/time, 1st schedule
  • 66Excluded period
  • 67Delivery date/time, current schedule
  • 68Additional period
  • 69Delivery date time, promised before
  • 70Additional date
  • 71Delivery date/time, requested for (after and including)
  • 72Delivery date/time, promised for (after and including)
  • 73Guarantee period
  • 74Delivery date/time, requested for (prior to and including)
  • 75Delivery date/time, promised for (prior to and including)
  • 76Delivery date/time, scheduled for
  • 77Specification revision date
  • 78Event date/time/period, actual
  • 79Shipment date/time, promised for
  • 80Planning end date and/or time, actual
  • 81Shipment date/time, requested for (after and including)
  • 82Medicine administration time
  • 83Dispensing interval, minimum
  • 84Shipment date/time, requested for (prior to and including)
  • 85Shipment date/time, promised for (prior to and including)
  • 86Medication date/time, start
  • 87Travel service connection time
  • 88Summer time, start
  • 89Inquiry date
  • 90Report start date
  • 91Report end date
  • 92Contract effective date
  • 93Contract expiry date
  • 94Production/manufacture date
  • 95Bill of lading date
  • 96Discharge date/time
  • 97Transaction creation date
  • 98Winter time, start
  • 99Quotation opening date
  • 100Product ageing period before delivery
  • 101Production date, no schedule established as of
  • 102Health problem period
  • 103Closing date/time for breakbulk STORO
  • 104Closing date/time for container RO-RO
  • 105Starting date/time for breakbulk STORO
  • 106Starting date/time for container RO-RO
  • 107Deposit date/time
  • 108Postmark date/time
  • 109Receive at lockbox date
  • 110Ship date, originally scheduled
  • 111Manifest/ship notice date
  • 112First interest-bearing date
  • 113Sample required date
  • 114Tooling required date
  • 115Sample available date
  • 116Equipment return period, expected
  • 117Delivery date/time, first
  • 118Cargo booking confirmed date/time
  • 119Test completion date
  • 120Last interest-bearing date
  • 121Entry date
  • 122Contract completion date
  • 123Documentary credit expiry date/time
  • 124Despatch note document issue date time
  • 125Import permit issue date time
  • 126Contract document issue date time
  • 127Previous report date
  • 128Delivery date/time, last
  • 129Exportation date
  • 130Current report date
  • 131Tax point date time
  • 132Transport means arrival date time, estimated
  • 133Transport means departure date/time, estimated
  • 134Rate of exchange date/time
  • 135Telex date
  • 136Transport means departure date time, actual
  • 137Document issue date time
  • 138Payment availability date time
  • 139Property mortgage date, start
  • 140Payment due date
  • 141Customs declaration document lodgement date time
  • 142Labour wage determination date
  • 143Consignment acceptance date time, actual
  • 144Quota date
  • 145Event date
  • 146Entry date, estimated (Customs)
  • 147Export permit effective end date time
  • 148Goods declaration document acceptance date time
  • 149Invoice date, required
  • 150Declaration/presentation date
  • 151Importation date
  • 152Exportation date for textiles
  • 153Cancellation date/time, latest
  • 154Acceptance date of document
  • 155Accounting period start date
  • 156Accounting period end date
  • 157Validity start date
  • 158Horizon start date
  • 159Horizon end date
  • 160Authorization date
  • 161Release date of customer
  • 162Release date of supplier
  • 163Processing start date/time
  • 164Processing end date/time
  • 165Tax period start date
  • 166Tax period end date
  • 167Charge period start date
  • 168Charge period end date
  • 169Lead time
  • 170Settlement due date
  • 171Reference date/time
  • 172Hired from date
  • 173Hired until date
  • 174Advise after date/time
  • 175Advise before date/time
  • 176Advise completed date/time
  • 177Advise on date/time
  • 178Transport means arrival date time, actual
  • 179Booking date/time
  • 180Closing date/time
  • 181Positioning date/time of equipment
  • 182Issue date
  • 183Date, as at
  • 184Notification date/time
  • 185Commenced tank cleaning date/time
  • 186Transport means departure date/time, actual
  • 187Authentication date/time of document
  • 188Previous current account date
  • 189Transport means departure date/time, scheduled
  • 190Transhipment date/time
  • 191Delivery date/time, expected
  • 192Expiration date/time of customs document
  • 193Execution date
  • 194Start date/time
  • 195Import permit effective end date time
  • 196Transport means departure date/time, earliest
  • 197Lay-time first day
  • 198Lay-time last day
  • 199Positioning date/time of goods
  • 200Cargo pick-up date / time
  • 201Equipment pick-up date / time
  • 202Posting date
  • 203Execution date/time, requested
  • 204Release date (Customs)
  • 205Settlement date
  • 206End date/time
  • 207Commenced pumping ballast date/time
  • 208Transport means departure date/time, ultimate
  • 209Value date
  • 210Reinsurance current account period
  • 211360/30
  • 212360/28-31
  • 213365-6/30
  • 214365-6/28-31
  • 215365/28-31
  • 216365/30
  • 217From date of award to latest delivery
  • 218Authentication/validation date/time
  • 219Crossborder date/time
  • 220Property mortgage scheduled date, end
  • 221Interest period
  • 222Presentation date, latest
  • 223Delivery date/time, deferred
  • 224Permit to admit date
  • 225Certification of weight date/time
  • 226Discrepancy date/time
  • 227Beneficiary's banks due date
  • 228Debit value date, requested
  • 229Hoses connected date/time
  • 230Hoses disconnected date/time
  • 231Transport means arrival date/time, earliest
  • 232Transport means arrival date/time, scheduled
  • 233Transport means arrival date/time, ultimate
  • 234Collection date/time, earliest
  • 235Collection date/time, latest
  • 236Completed pumping ballast date/time
  • 237Completed tank cleaning date/time
  • 238Tanks accepted date/time
  • 239Tanks inspected date/time
  • 240Reinsurance accounting period
  • 241From date of award to earliest delivery
  • 242Preparation date/time of document
  • 243Transmission date/time of document
  • 244Settlement date, planned
  • 245Underwriting year
  • 246Accounting year
  • 247Year of occurrence
  • 248Loss
  • 249Cash call date
  • 250Re-exportation date
  • 251Re-importation date
  • 252Arrival date/time at initial port
  • 253Departure date/time from last port of call
  • 254Registration date of previous Customs declaration
  • 255Availability due date
  • 256From date of award to completion
  • 257Calculation date time
  • 258Guarantee date
  • 259Conveyance registration date
  • 260Valuation date (Customs)
  • 261Release date/time
  • 262Closure date/time/period
  • 263Invoicing period
  • 264Release frequency
  • 265Due date
  • 266Validation date
  • 267Rate/price date/time
  • 268Transit time/limits
  • 269Discharge date/time, started
  • 270Ship during date
  • 271Ship on or about date
  • 272Documentary credit presentation period
  • 273Validity period
  • 274From date of order receipt to sample ready
  • 275From date of tooling authorization to sample ready
  • 276From date of receipt of tooling aids to sample ready
  • 277From date of sample approval to first product shipment
  • 278From date of order receipt to shipment
  • 279From date of order receipt to delivery
  • 280From last booked order to delivery
  • 281Date of order lead time
  • 282Confirmation date lead time
  • 283Arrival date/time of transport lead time
  • 284Before inventory is replenished based on stock check lead time
  • 285Invitation to tender date/time
  • 286Tender submission date/time
  • 287Contract award date/time
  • 288Price base date/time
  • 289Interest rate validity period
  • 290Contractual start date/time
  • 291Start date/time, planned
  • 292Works completion date/time, planned
  • 293Works completion date/time, actual
  • 294Hand over date/time, planned
  • 295Hand over date/time, actual
  • 296Retention release date/time
  • 297Retention release date/time, partial
  • 298Goods pick-up date / time, planned
  • 299Price adjustment start date
  • 300Price adjustment limit date
  • 301Value date of index
  • 302Publication date
  • 303Escalation date
  • 304Price adjustment date
  • 305Latest price adjustment date
  • 306Work period
  • 307Payment instruction date/time
  • 308Payment valuation presentation date/time
  • 309Banks' value date
  • 310Received date/time
  • 311On
  • 312Ship not before and not after date/time
  • 313Order to proceed date
  • 314Planned duration of works
  • 315Agreement to pay date
  • 316Valuation date/time
  • 317Reply date
  • 318Request date
  • 319Customer value date
  • 320Declaration reference period
  • 321Promotion date/period
  • 322Accounting period
  • 323Horizon period
  • 324Processing date/period
  • 325Tax period
  • 326Charge period
  • 327Instalment payment due date
  • 328Payroll deduction date/time
  • 329Person birth date time
  • 330Joined employer date
  • 331Contributions ceasing date/time
  • 332Contribution period end date/time
  • 333Part-time working change date/time
  • 334Status change date/time
  • 335Contribution period start date/time
  • 336Salary change effective date
  • 337Left employer date
  • 338Benefit change date/time
  • 339Category change date/time
  • 340Joined fund date/time
  • 341Waiting time
  • 342Consignment loading date time
  • 343Date/time of discount termination
  • 344Date/time of interest due
  • 345Days of operation
  • 346Latest check-in time
  • 347Slaughtering start date
  • 348Packing start date
  • 349Packing end date
  • 350Test start date
  • 351Inspection date
  • 352Slaughtering end date
  • 353Accounting transaction date
  • 354Activity period date range
  • 355Contractual delivery date
  • 356Sales date, and or time, and or period
  • 357Cancel if not published by this date
  • 358Scheduled for delivery on or after
  • 359Scheduled for delivery on or before
  • 360Sell by date
  • 361Product best before date time
  • 362End availability date
  • 363Total shelf life period
  • 364Minimum shelf life remaining at time of despatch period
  • 365Packaging date
  • 366Inventory report date
  • 367Meter reading date, previous
  • 368Meter reading date, latest
  • 369Date and or time of handling, estimated
  • 370Date when container equipment becomes domestic
  • 371Hydrotest date
  • 372Equipment pre-trip date
  • 373Mooring, date and time
  • 374Road fund tax expiry date
  • 375Date of first registration
  • 376Biannual terminal inspection date
  • 377Federal HighWay Administration (FHWA) inspection date
  • 378Container Safety Convention (CSC) inspection date
  • 379Periodic inspection date
  • 380Drawing revision date
  • 381Product lifespan at time of production
  • 382Earliest sale date
  • 383Cancel if not shipped by this date
  • 384Previous invoice date
  • 385Payment cancelled, violation of agreement
  • 386Payment cancelled due to administrative error
  • 387Repair turnaround time
  • 388Order amendment binding date
  • 389Cure time
  • 390From date of award to delivery
  • 391From date of receipt of item to approval
  • 392Equipment pick-up date / time, earliest
  • 393Equipment pick-up date / time, planned
  • 394Equipment positioning date/time, actual
  • 395Equipment positioning date/time, estimated
  • 396Equipment positioning date/time, requested
  • 397Equipment positioning date/time, ultimate
  • 398Goods collection or pick-up date/time, planned
  • 399Goods positioning date/time, expected
  • 400Cargo release date/time, ultimate
  • 401Container Safety Convention (CSC) plate expiration date
  • 402Document received date/time
  • 403Discharge date/time, actual
  • 404Transport means loading date/time, actual
  • 405Equipment pick-up date / time, actual
  • 406Goods positioning date/time, planned
  • 407Document requested date/time
  • 408Expected container hire from date/time
  • 409Order completion date/time, ultimate
  • 410Equipment repair ready date/time, ultimate
  • 411Container stuffing date/time, ultimate
  • 412Container stripping date/time, ultimate
  • 413Discharge and loading completed date/time
  • 414Equipment stock check date/time
  • 415Activity reporting date
  • 416Submission date
  • 417Previous booking date/time
  • 418Minimum shelf life remaining at time of receipt
  • 419Forecast period
  • 420Unloaded, date and time
  • 421Estimated acceptance date
  • 422Documentary credit issue date
  • 423First date of ordering
  • 424Last date of ordering
  • 425Original posting date
  • 426Reinsurance payment frequency
  • 427Adjusted age
  • 428Original issue age
  • 429Coverage duration
  • 430Coverage issue date
  • 431Flat extra period
  • 432Paid to date
  • 433Reinsurance coverage duration
  • 434Maturity date
  • 435Reinsurance issue age
  • 436Reinsurance paid-up date
  • 437Benefit period
  • 438Disability wait period
  • 439Deferred Period
  • 440Documentary credit amendment date
  • 441Last on hire date
  • 442Last off hire date
  • 443Direct interchange date
  • 444Approval date
  • 445Original estimate date
  • 446Revised estimate date
  • 447Creditor's requested value date
  • 448Referenced item creation date
  • 449Date for the last update
  • 450Opening date
  • 451Source document capture date
  • 452Trial balance period
  • 453Date of source document
  • 454Accounting value date
  • 455Expected value date
  • 456Chart of account period
  • 457Date of separation
  • 458Date of divorce
  • 459Date of marriage
  • 460Wage period, start date
  • 461Wage period, end date
  • 462Working period, start date
  • 463Working period, end date
  • 464Embarkation date and time
  • 465Disembarkation date and time
  • 466Time now date
  • 467Holiday
  • 468Non working
  • 469Start date or time, earliest
  • 470Start date or time, latest
  • 471Finish date or time, earliest
  • 472Finish date or time, latest
  • 473Start date or time, mandatory
  • 474Finish date or time, mandatory
  • 475Start date or time, actual
  • 476Start date or time, estimated
  • 477Completion date or time, estimated
  • 478Start date or time, scheduled
  • 479Completion date or time, scheduled
  • 480Start date or time, not before
  • 481Start date or time, not after
  • 482Completion date or time, not before
  • 483Completion date or time, not after
  • 484Illness recovery date, expected
  • 485Period of illness, start date
  • 486Period of illness, end date
  • 487Decease date
  • 488Benefit period, start date
  • 489Benefit period, end date
  • 490Selection period, start date
  • 491Selection period, end date
  • 492Balance date/time/period
  • 493Benefit payments termination date
  • 494Covered income period
  • 495Current income period
  • 496Reinstatement date
  • 497Definition of disability duration
  • 498Previous termination date
  • 499Premium change period
  • 500Off-hire survey date
  • 501In service survey date
  • 502On hire survey date
  • 503Production inspection date
  • 504Overtime, start date
  • 505Overtime, end date
  • 506Back order delivery date/time/period
  • 507Negotiations start date
  • 508Work effective start date
  • 510Notification time limit
  • 511Time limit
  • 512Attendance date and or time and or period
  • 513Accident date and or time
  • 514Adoption date, actual
  • 515Reimbursement claim issue date and or time
  • 516Hospital admission date and or time
  • 517Hospital discharge date and or time
  • 518Period of care start date and or time
  • 519Period of care end date and or time
  • 520Department admission date and or time
  • 521Department discharge date and or time
  • 522Childbirth date and or time, actual
  • 523Prescription issue date and or time
  • 524Prescription dispensing date and or time
  • 525Clinical examination date and or time
  • 526Death date and or time
  • 527Childbirth date, estimated
  • 528Last menstrual cycle, start date
  • 529Pregnancy duration, actual
  • 530Fumigation date and/or time
  • 531Payment period
  • 532Average delivery delay
  • 533Budget line application date
  • 534Date of repair or service
  • 535Date of product failure
  • 536Review date
  • 537International review cycle start date
  • 538International assessment approval for publication date
  • 539Status assignment date
  • 540Instruction's original execution date
  • 541First published date
  • 542Last published date
  • 543Balance sheet date, latest
  • 544Security share price as of given date
  • 545Assigned date
  • 546Business opened date
  • 547Initial financial accounts filed date
  • 548Stop work as of given date
  • 549Completion date
  • 550Lease term, start date
  • 551Lease term, end date
  • 552Start date, actual
  • 553Start date, estimated
  • 554Filed date
  • 555Return to work date
  • 556Purchased date
  • 557Returned date
  • 558Changed date
  • 559Terminated date
  • 560Evaluation date
  • 561Business termination date
  • 562Release from bankruptcy date
  • 563Placement date, initial
  • 564Signature date
  • 565Bankruptcy filed date
  • 566End date, scheduled
  • 567Report period
  • 568Suspended date
  • 569Renewal date
  • 570Reported date
  • 571Checked date
  • 572Present residence, start date
  • 573Employment position, start date
  • 574Account closed date
  • 575Construction date, actual
  • 576Employment profession start date
  • 577Next review date
  • 578Meeting date
  • 579Administrator ordered date
  • 580Last date to file a claim
  • 581Convicted date
  • 582Interviewed date
  • 583Last visit date
  • 584Future period
  • 585Preceding period
  • 586Expected problem resolution date
  • 587Action date
  • 588Accountant's opinion date
  • 589Last activity date
  • 590Resolved date
  • 591Recorded date
  • 592Date of birth, estimated
  • 593Last annual report date
  • 594Net worth date
  • 595Payment cancellation rejected
  • 596Profit period
  • 597Registration date
  • 598Consolidation date
  • 599Board of directors not authorised as of given date
  • 600Board of directors not complete as of given date
  • 601Manager not registered as of given date
  • 602Citizenship change date
  • 603Participation date
  • 604Capitalisation date
  • 605Board of directors registration date
  • 606Operations ceased date
  • 607Satisfaction date
  • 608Legal settlement terms met date
  • 609Business control change date
  • 610Court registration date
  • 611Annual report due date
  • 612Asset and liability schedule date
  • 613Annual report mailing date
  • 614Annual report filing date
  • 615Annual report delinquent on date
  • 616Accounting methodology change date
  • 617Closed until date
  • 618Conversion into holding company date
  • 619Deed not available as of given date
  • 620Detrimental information receipt date
  • 621Construction date, estimated
  • 622Financial information date
  • 623Graduation date
  • 624Insolvency discharge granted date
  • 625Incorporation date
  • 626Inactivity end date
  • 627Last check for balance sheet update date
  • 628Last capital change date
  • 629Letter of agreement date
  • 630Letter of liability date
  • 631Liquidation date
  • 632Lowest activity period
  • 633Legal structure change date
  • 634Current name effective date
  • 635Not registered as of given date
  • 636Current authority control start date
  • 637Privilege details verification date
  • 638Current legal structure effective date
  • 639Peak activity period
  • 640Presentation to bankruptcy receivers date
  • 641Resignation date
  • 642Legal action closed date
  • 643Mail receipt date
  • 644Social security claims verification date
  • 645Sole directorship registration date
  • 646Trade style registration date
  • 647Trial start date, scheduled
  • 648Trial start date, actual
  • 649Value Added Tax (VAT) claims verification date
  • 650Receivership result date
  • 651Investigation end date
  • 652Employee temporary laid-off period end date
  • 653Investigation start date
  • 654Income period
  • 655Criminal sentence duration
  • 656Age
  • 657Receivables collection period
  • 658Comparison period
  • 659Adjournment
  • 660Court dismissal date
  • 661Insufficient assets judgement date
  • 662Average payment period
  • 663Forecast period start
  • 664Period extended
  • 665Employee temporary laid-off period start date
  • 666Management available date
  • 667Withdrawn date
  • 668Claim incurred date
  • 669Financial coverage period
  • 670Claim made date
  • 671Stop distribution date
  • 672Period assigned
  • 673Lease period
  • 674Forecast period end date
  • 675Judgement date
  • 676Period worked for the company
  • 677Transport equipment stuffing date and/or time
  • 678Transport equipment stripping date and/or time
  • 679Initial request date
  • 680Period overdue
  • 681Implementation date/time/period
  • 682Refusal period
  • 683Suspension period
  • 684Deletion date
  • 685First sale date and/or time and/or period
  • 686Last sale date and/or time and/or period
  • 687Date ready for collection
  • 688Shipping date, no schedule established as of
  • 689Shipping date and/or time, current schedule
  • 690Suppliers' average credit period
  • 691Advising date
  • 692Project over target baseline date
  • 693Established date
  • 694Latest filing period
  • 695Mailing date
  • 696Date/time of latest accounts filing at public registry
  • 697Date placed in disfavour
  • 698Employment position start date, estimated
  • 699Registered contractor number assignment date, original
  • 700Ownership change date
  • 701Original duration
  • 702Period between changes
  • 703From date of notice to proceed to commencement of performance
  • 704From date of notice to proceed to completion
  • 705Period an event is late due to customer
  • 706File generation date and/or time
  • 707Endorsed certificate issue date
  • 708Patient first visit for condition
  • 709Admission date and/or time, expected
  • 710Symptoms onset, patient alleged
  • 711Accident benefit period
  • 712Accident benefit age limit
  • 713Accident lifetime benefit qualification age
  • 714Sickness benefit period
  • 715Sickness benefit age limit
  • 716Sickness lifetime benefit qualification age
  • 717Accident insurance elimination period
  • 718Sickness insurance elimination period
  • 719Provider signature date
  • 720Condition initial treatment date
  • 721Information release authorization date
  • 722Benefit release authorization date
  • 723Last seen date
  • 724Acute manifestation date
  • 725Similar illness onset date
  • 726Last X-ray date
  • 727Placement date, previous
  • 728Placement date
  • 729Temporary prosthesis date
  • 730Orthodontic treatment period, remaining
  • 731Orthodontic treatment period, total
  • 732Maximum credit granted date
  • 733Last date of accounts filed at public register
  • 734Allowed renewal duration period
  • 735Offset from Coordinated Universal Time (UTC)
  • 736Appointment expiry date
  • 737Earliest filing period
  • 738Original name change date
  • 739Education start date
  • 740Education end date
  • 741Receivership period
  • 742Financial information submission date/time
  • 743Purchase order latest possible change date
  • 744Investment number allocation date
  • 745Payment impossible
  • 746Record extraction period
  • 747Cost accounting value date
  • 748Open period
  • 749Period between issue date and maturity date
  • 750Before date
  • 751After date
  • 752Meter reading date, next scheduled
  • 753Maturity date, optimal
  • 754Product ageing duration, maximum
  • 755Product ageing duration, minimum
  • 756Ultimate documentation date/time for 24-hour rule regulation of CBP (United States Customs and Border Protection)
  • 757Departure date/time from place of loading
  • 758Trade item ship date/time, earliest possible
  • 759Trade item ship date/time, latest possible
  • 760Start date/time, maximum buying quantity
  • 761Start date/time, minimum buying quantity
  • 762Marketing campaign end date/time, suggested
  • 763Marketing campaign start date/time, suggested
  • 764Start availability date
  • 765Seasonal availabilty calendar year
  • 766Goods pickup lead time
  • 767Change date/time, latest
  • 768End date/time, maximum buying quantity
  • 769End dat/time, minimum buying quantity
  • 770End date/time of exclusivity
  • 771Data release date
  • 772Handling start date and/or time, actual
  • 773Handling end date and/or time, estimated
  • 774Handling end date and/or time, actual
  • 775Minimum product lifespan for consumer
  • 776Entry date, elected
  • 777Arrival date/time at initial port with the intent to unload
  • 778Conveyance port activity date/ time
  • 779Date and time of importation into port limits
  • 780Free trade zone commodity status assignment date
  • 781Jurisdiction entry date/time, actual
  • 782Inspection start date/time
  • 783Inspection end date/time
  • 784Document/message rejection date/time
  • 785Government service date/time, requested
  • 786Crop year
  • 787Date of original manufacture
  • 788Model year
  • 789Opened trade item life span
  • ZZZMutually defined