Element
EDIFACT EDI Release D94B
QVA
6063Quantity qualifier
EDI EDIFACT D94B QVA0102 Element Schema
属性
数据类型ID
必须?Optional
长度Min 0 / Max 3
Codes (143)
  • 1Discrete quantity
  • 2Charge
  • 3Cumulative quantity
  • 11Split quantity
  • 12Despatch quantity
  • 17Quantity on hand
  • 18Previous quantity
  • 20Unusable quantity
  • 21Ordered quantity
  • 22Quantity at 100%
  • 23Active ingredient
  • 31Estimated annual volume
  • 32Minimum delivery batch
  • 33Maximum delivery batch
  • 35Price break from
  • 36Price break to
  • 40Normal delivery
  • 46Pieces delivered
  • 47Invoiced quantity
  • 48Received quantity
  • 49Chargeable distance
  • 52Quantity per pack
  • 53Minimum order quantity
  • 54Maximum order quantity
  • 59Numbers of consumer units in the traded unit
  • 61Return quantity
  • 62Sorted quantity
  • 63Sorted quantity rejected
  • 64Scrap quantity
  • 65Destroyed quantity
  • 66Committed quantity
  • 70Cumulative quantity received
  • 71Cumulative quantity ordered
  • 72Cumulative quantity received end of prior year
  • 73Outstanding quantity
  • 74Latest cumulative quantity
  • 75Previous highest cumulative quantity
  • 77Work days
  • 78Cumulative quantity scheduled
  • 79Previous cumulative quantity
  • 81Extra unplanned delivery
  • 82Quantity requirement for sample inspection
  • 83Backorder quantity
  • 84Urgent delivery quantity
  • 85Previous order quantity to be cancelled
  • 90As is quantity
  • 91Open quantity
  • 92Final delivery quantity
  • 93Subsequent delivery quantity
  • 94Substitutional quantity
  • 95Redelivery after post processing
  • 99Estimated quantity
  • 100Chargeable weight
  • 101Chargeable gross weight
  • 102Chargeable tare weight
  • 103Chargeable number of axles
  • 104Chargeable number of containers
  • 105Chargeable number of rail wagons
  • 106Chargeable number of packages
  • 107Chargeable number of units
  • 108Chargeable period
  • 109Chargeable volume
  • 110Chargeable cubic measurements
  • 111Chargeable surface
  • 112Chargeable length
  • 113Quantity to be delivered
  • 114Number of passengers
  • 115Number of crew
  • 116Number of transport documents
  • 117Quantity landed
  • 118Quantity manifested
  • 119Short shipped
  • 120Split shipment
  • 121Over shipped
  • 122Short-landed goods
  • 123Surplus goods
  • 124Damaged goods
  • 125Pilferage goods
  • 126Lost goods
  • 127Report difference
  • 128Quantity loaded
  • 129Units per unit price
  • 130Allowance
  • 131Delivery quantity
  • 132Cumulative quantity, preceding period, planned
  • 133Cumulative quantity, preceding period, reached
  • 134Cumulative quantity, actual planned
  • 135Period quantity, planned
  • 136Period quantity, reached
  • 137Cumulative quantity, preceding period, estimated
  • 138Cumulative quantity, actual estimated
  • 139Cumulative quantity, preceding period, measured
  • 140Cumulative quantity, actual measured
  • 141Period quantity, measured
  • 142Total quantity, planned
  • 143Quantity, remaining
  • 144Tolerance
  • 145Actual stock
  • 146Model or target stock
  • 147Direct shipment quantity
  • 148Amortization total quantity
  • 149Amortization order quantity
  • 150Amortization cumulated quantity
  • 151Quantity advised
  • 152Quantity on hand
  • 153Statistical sales quantity
  • 154Sales quantity planned
  • 155Replenishment quantity
  • 156Inventory movement quantity
  • 157Opening stock balance quantity
  • 158Closing stock balance quantity
  • 159Number of stops
  • 160Minimum production batch
  • 161Dimensional sample quantity
  • 162Functional sample quantity
  • 163Pre-production quantity
  • 164Delivery batch
  • 165Delivery batch multiple
  • 166All time buy
  • 167Total delivery quantity
  • 168Single delivery quantity
  • 169Supplied quantity
  • 170Allocated quantity
  • 171Maximum stackability
  • 172Amortisation quantity
  • 173Previously amortised quantity
  • 174Total amortisation quantity
  • 175Number of moulds
  • 176Concurrent item output of tooling
  • 177Periodic capacity of tooling
  • 178Lifetime capacity of tooling
  • 179Number of deliveries per despatch period
  • 180Provided quantity
  • 181Maximum production batch
  • 182Cancelled quantity
  • 183No delivery requirement in this instruction
  • 184Quantity of material in ordered time
  • 185Rejected quantity
  • 186Cumulative quantity scheduled up to accumulation start date
  • 187Quantity scheduled
  • 188Number of identical handling units
  • 189Number of packages in handling unit
  • 190Despatch note quantity