Element
X12 EDI Release 00302
LN1
122Rate/Value Qualifier
Code qualifying how to extend charges or interpret value.
属性
数据类型ID
必须?Optional
Codes (94)
  • AAPercent Of Amount Advanced
  • ACPercent Of Amount Of Collection
  • AVAd Valorum (Per Cent of Value)
  • B0Per Board Feet
  • B1Per 100 Board Feet
  • BFPer 1,000 Board Feet
  • BLBill of Lading Declared Value
  • BRPer Barrel
  • C5Per 50 Cubic Feet
  • CFPer 40 Cubic Feet (Measurement Ton)
  • CMPer Cubic Meter
  • CTCharge or Credit Based on Percentage of Total
  • DDDepartment of Defense Unique Codes
  • DPPer $1000
  • DRPer Dromedary Service Shipment
  • DSPer Hundredweight Per Mile Per Dromedary Service Shipment
  • EIEx Parte Increase
  • ERPer Each Request
  • FCFlat Charge
  • FFPercent Of Tariff Rate
  • FLPer Flat Bed
  • FNPer Two Weeks
  • FRFlat Rate
  • FTPer Foot
  • FVLoaded to Full Visible Capacity
  • GTPer Gross Ton
  • HDPer Hundredweight Per Dromedary Service Shipment
  • HMRate Per Hundred Weight Per Mile
  • HNPer Half Month
  • HYPer Half Year
  • KGPer Kilograms
  • KLPer Kiloliter
  • KPPer Kilometer
  • KTPer Kilotons
  • LBPer Pound
  • LPPer Label
  • LRPer Litre
  • LSLump Sum
  • LTPer Long Ton
  • MDPer Man Per Day
  • MEMultiple Equipment
  • MHPer Man Per Hour
  • MINegative Charge
  • MMPer Metric Ton (Tonne)
  • MNMinimum
  • MOPer Month
  • MPMaximum Per Shipment
  • MSMinimum Per Shipment
  • MTPer Permit
  • MVPer Mile Per Vehicle (Rail Car) Moved
  • MWMinimum Per Vehicle
  • MXMixed Shipment Rule
  • PAPer Container
  • PBPer Barge
  • PCPer Car
  • PDPer Day
  • PEPer 20 Foot Equivalent (TEU)
  • PFPer Cubic Foot
  • PGPer Gallon
  • PHPer Hundred (of Basic Unit)
  • PKPer Cord
  • PLPer Load
  • PMPer Mile
  • PPPer Piece
  • PQPer Period
  • PRPer Hour
  • PSPer Shipment
  • PTPer Net Ton
  • PUPer Unit
  • PVPer Vehicle
  • QYPer Quarter Year
  • RPPercent Of Rate
  • S0Per 1000 Square Feet
  • S1Per 100 Square Feet
  • SCPer Stencil
  • SDShipper's Export Declaration Value
  • SFPer Square Feet
  • SPPer Stop
  • STPer Short Ton
  • SUPer Stack Car Unit
  • SYSquare Yard
  • TBPer 2 Trailers Same Day
  • TCPer 3 Trailers Same Day
  • TDPer 4 Trailers Same Day
  • TNPer Train Rate
  • TPPer Tag
  • TRPer Trailer (Per Train)
  • VMVolume
  • VPMaximum Per Vehicle
  • VSVarious
  • VUPer Mile Per Vehicle (Rail Car) Used
  • WKPer Week
  • WMWeight or Measurement
  • YRPer Year