Segment
X12 EDI Release 00304
To specify legal outcome and impact of foreclosure on a lender's claim for mortgage insurance benefits
Elements
Code identifying the deficiency judgment
Codes (4)- 1Deficiency Judgment Authorized by Mortgage Insurer but Not Obtained
- 2Deficiency Judgment Obtained but Not Authorized by Mortgage Insurer
- 3Deficiency Judgment Authorized by Mortgage Insurer and Obtained
- 4Deficiency Judgment Not Authorized by Mortgage Insurer and Not Obtained
Code to qualify amount
Codes (432)- 1Line Item Total
- 2Batch Total
- 3Deposit Total
- 4Lock Box Total
- 5Total Invoice Amount
- 6Amount Subject to Total Monetary Discount
- 7Discount Amount Due
- 8Total Monetary Discount Amount
- 9Total Operational Statement Amount
- 10Shipment Value in U.S. Dollars
- 11Liabilities at Bankruptcy
- 12Account Average Balance Account
- 13Outstanding Balance at Foreclosure
- 14Legal Obligation Debt Amount
- 15Estimated Closing Cost Amount
- 16Discount Fees Paid by Borrower Amount
- 17Closing Costs or Concessions Paid by Seller
- 18Prepaid Items Amount
- 19Federal Housing Administration, Mortgage Insurance Premium Funding Fee Financed Amount
- 20Federal Housing Administration, Mortgage Insurance Premium or Veteran's Administration Funding Fee Amount
- 21Original Cost of Property Amount
- 22Owner's Estimate of Value Amount
- 23Appraised Value Amount
- 24Gross Monthly Income Amount
- 25Assets at Bankruptcy
- 26Negotiated Cost
- 27Authorized Unpriced Work
- 28Target Price
- 29Estimated Price
- 30Contract Ceiling
- 31Estimated Contract Ceiling
- 32Target Fee or Profit Amount
- 33Original Contract Target Cost
- 34Negotiated Contract Changes
- 35Current Target Cost
- 36Contract Budget Base (CBB)
- 37Current Budgeted Cost for Work Scheduled (BCWS)
- 38Current Budgeted Cost for Work Performed (BCWP)
- 39Current Actual Cost of Work Performed (ACWP)
- 40Current Schedule Variance (SV)
- 41Current Cost Variance (CV)
- 42Cumulative Budgeted Cost for Work Scheduled (BCWS)
- 43Cumulative Budgeted Cost for Work Performed (BCWP)
- 44Cumulative Actual Cost of Work Performed (ACWP)
- 45Cumulative Schedule Variance (SV)
- 46Cumulative Cost Variance (CV)
- 47Reprogram Cost Variance
- 48Reprogram Budget
- 49At Complete Budget (BAC)
- 50At Complete Latest Revised Estimate (LRE)
- 51At Complete Variance
- 52Total Allocated Budget
- 53Difference (Contract Budget Base - Total Allocated Budget)
- 54Forecast
- 55At Complete Forecast
- 56Current Cost Performance Index (CPIe) - Efficiency (BCWP/ACWP)
- 57Current Cost Performance Index (CPIp) - Planned (ACWP/BCWP)
- 58Current Schedule Performance Index (SPI)
- 59Cumulative Cost Performance Index (CPIe) - Efficiency (BCWP/ACWP)
- 60Cumulative Cost Performance Index (CPIp) - Planned (ACWP/BCWP)
- 61Cumulative Schedule Performance Index (SPI)
- 62To Complete Performance Index (TCPI) for Budget at Complete (BAC)
- 63To Complete Performance Index (TCPI) for Estimate At Complete (EAC)
- 64Initial Contract Price Target
- 65Initial Contract Price Ceiling
- 66Adjusted Contract Price Target
- 67Adjusted Contract Price Ceiling
- 68Funds Authorized to Date
- 69Accrued Expenditures
- 70Open Commitments
- 71Forecast of Billings
- 72Estimated Termination Costs
- 73Accrued Expenditures plus Open Commitments
- 74Contract Work Authorized - Definitized
- 75Contract Work Authorized - Not Definitized
- 76Contract Work Authorized - Total
- 77Forecast of Work - Not Yet Authorized
- 78Forecast of Work - All Other
- 79Forecast of Work - Total
- 80Funding - Total Requirements
- 81Funds Carryover
- 82Net Funds Required
- 83Contract Work Authorized (with fee/profit) Actual or Projected
- 84Contract Work Authorized (with fee/profit) Actual or Projected - At Complete
- 85Best Case Estimate
- 86Worst Case Estimate
- 87Most Likely Estimate
- 88"As Is" Appraisal Amount
- 89"Subject To" Appraisal Amount
- 90"Completion Per Plans" Appraisal Amount
- 91Site Value Amount
- 92Compensation
- 93Contribution
- 94Death Benefit
- 95Death Benefit Decrement
- 96Employee Account Balance
- 97Loan Repayment
- 98Prior W2
- 99Single Premium
- AAdjusted Chargeback Claim Amount
- BEstimated
- CCity
- DPayor Amount Paid
- EEstimated Credit
- FAnnual Limit
- HBid Amount
- IInterest
- JTrustee Fees
- KAttorney and Trustee Fees
- LLocal
- MAmount Due from Buyer at Appraisal Notice Date
- NNet
- PPenalty
- QAmount Owed to Buyer at Appraisal Notice Date
- SSubmitted Chargeback Claim Amount
- TTax
- WDeficiency Judgment Fees
- XDeficiency Judgment Expenses and Fees
- A1Average Negative Ledger Balance
- A2Average Positive Collected Balance
- A3Average Negative Collected Balance
- A4Average Positive Ledger Balance
- A5Disallowed - Estimated
- A6Disallowed - Actual
- A7Noncovered Charges - Estimated
- A8Noncovered Charges - Actual
- A9Allowed - Estimated
- ABAdjusted Collected Balance
- ACAverage Collected Balance
- ADAdjusted Total
- AFAverage Float
- AGAdjusted Gross Income
- AHLoan Balance Difference
- AISale Amount
- AJFunds Held by Mortgagee
- AKAttorney Fees
- ALAverage Ledger Balance
- AMAmount Financed
- ANBankruptcy Fee
- AOAmount Override
- APAmount Prior to Fractionalization
- AQAverage Price Per Call
- ARFees to Public Officials for Foreclosure
- ASAverage Price Per Minute
- ATTotal Received
- AUCoverage Amount
- AVActual Cash Value
- AWReplacement Cost
- AXPrevious Price
- AYTitle Cost
- AZOther Foreclosure and Acquisition Expenses
- B1Benefit Amount
- B2Bonuses and Commissions Divided Over 12 Months
- B3Bonuses Divided Over 12 Months
- B4Bonuses and Commissions
- B5Budgeted
- B6Allowed - Actual
- B7Deductible - Estimated
- B8Co-insurance - Estimated
- B9Co-insurance - Actual
- BABargain
- BBMortgage Insurance Premiums
- BCBilling Cycle Net Fee Position (Excess/Deficit)
- BDBalance Due
- BEDisbursements for Authorized Repair
- BFHazard Insurance Premium
- BGEviction Attorney Fees
- BHEviction Expenses
- BIProperty Taxes
- BJDisbursements Not Shown Elsewhere
- BKDisbursements for Protection and Preservation
- BLDisbursements for Inspections and Boarding
- BMAdjustments
- BNRental Income
- BORental Expense
- BRAdjusted Insured Loss Amount
- BSMortgage Note Interest
- BTBank Reject Total
- BUOverhead Costs
- BVUncollected Interest
- BWAmount Due from Buyer at Closing
- BXAmount Owed to Buyer at Closing
- BYAdditional Closing Expenses
- BZDeficiency Judgment Expenses
- C1Co-Payment Amount
- C2Child Rider Coverage
- C3Prior Payment - Estimated
- C4Prior Payment - Actual
- C5Claim Amount Due - Estimated
- C6Claim Amount Due - Actual
- C7Payor Responsibility - Estimated
- C8Payor Responsibility - Actual
- C9Disallowed Cost Containment - Actual
- CBCollected Balance Required
- CCChargeback Claim Amount
- CDOverpaid Section 235 Subsidy
- CESummary Amount
- CFAppraisal Fees
- CGCommission Fees Deducted
- CHChange Amount
- CIFunds Held for Insured
- CJOther Deductions
- CKBack End Load
- CLOutstanding Balance Current Lender
- CMClaimant Requested Total
- CNSpecial Assessments
- COTaxes on Deed
- CPStatutory Disbursements
- CQNet Claim Amount
- CSCommission Sales
- CTContract
- D1Deferred Compensation Commissions
- D2Deductible Amount
- D3Deferred Compensation Commissions and Bonuses
- D4Deferred Compensation
- D5Dependent Care Contribution
- D6Disallowed Cost Containment - Estimated
- D7Dispensing Fee
- D8Discount Amount
- DAOriginal Mortgage
- DBUnapplied Section 235 Funds
- DCUnapplied Buydown Fund
- DDDirect Deposit
- DEEstimate of Damage
- DFAuthorized Bid
- DGEscrow Balance
- DHTotal Disbursements
- DYPer Day Limit
- E1Employer Year to Date Contribution
- E2Employee Annual Pledge Amount
- E3Employee Current Contribution
- E4Employer Pledge Amount
- E5Employer Current Contribution
- E6Eligible Wage Amount
- E7Employee Year to Date Contribution
- E8Education Contribution
- E9Initial Fee
- EAEarnings Allowance
- EBCollected Balance (Excess/Deficit)
- ECAllowance (Excess/Deficit)
- EDEstimated Cost of Attendance
- EFEstimated Financial Aid
- EPEmployer Annual Pledge Amount
- F1Maximum Allowable Cost (MAC) Penalty Copay
- F2Patient Responsibility - Actual
- F3Patient Responsibility - Estimated
- F4Postage Claimed
- F5Patient Amount Paid
- F6Provider Reserves
- F7Sales Tax
- F8Usual and Customary Charge - Estimated
- F9Usual and Customary - Actual
- FCExpected Family Contribution
- FDDirect Deposit Flipped to Check
- FIFirst Interest Payment Amount
- FLFloat
- FMFair Market Value
- FOFees Paid
- FPFees Paid Year to Date
- I1Investment Income
- IBInvestable Balance
- ICAccrued Unpaid Interest To Be Capitalized
- IIIrregular Interest Payment Amount
- IPInterest Payable During Repayment Period
- IRInsurance Recovery
- IUAccrued Unpaid Interest Not To Be Capitalized
- KAEstimated Contract
- KBEstimated Net Adjustment
- KCObligated
- KDUndefinitized
- KEAnnual Revenue
- KFNet Paid Amount
- KGNet Collected Amount
- KHDeduction Amount
- KINet Variance Amount
- KJMinimum Contract Amount
- KKItem Gross Amount
- KLCollected Amount
- KMDisbursed Amount
- KNGross Amount of Payment
- KOCommitted Amount
- KPPrincipal and Interest
- KQIncremental Order Amount
- KSTaxes and Insurance
- KTDefault Principal
- KUDefault Interest
- KWDefault Taxes and Insurance
- KXMiscellaneous Fee Collections
- KZMortgagor's Monthly Obligations
- L1Legal Contribution
- LCLessor's Cost
- LELoan Eligibility Amount
- LILine Item Unit Price
- LMLimit
- LNLien Payoff
- LPList Price
- LWTax and Insurance Escrow Fund Balance
- LXLoan Expense
- LYTotal Remaining Principal Balance for the Issuer
- LZDelinquent Payment
- M1Maximum Out of Pocket Amount
- M2Medical Contribution
- MAMaximum Amount
- MBUndistributed Budget
- MCCost of Money
- MNMonthly Limit
- MOMinimum Order Value
- MPMonthly Payment Amount
- MRManagement Reserve
- MSPast-Due Taxes and Assessment Remaining Unpaid
- N1Net Worth
- NANet Adjustment
- NBNet Compensation Position
- NCNegative Collected Balance
- NDPer Person Monthly Limit
- NFMonthly Net Fee Position (Excess/Deficit)
- NLNegative Ledger Balance
- NONon Commission Sales
- NPNet to Pay Total
- NQAdjusted Nonrecurring
- NRNonrecurring
- NSNet Savings Amount
- NYNet Year to Date (Excess/Deficit)
- OBOutstanding Loan Balance
- OLOutstanding Balance Other Lender
- OPOriginal Payment Total
- P1Partner's Calendar Year Salary
- P2Prior Plan Year Gross Salary
- P3Premium Amount
- P4Prior Year's Wage
- P5Partner's Tax Year Salary
- P6Premium Due
- P7Partner's K1 Tax Year Amount
- P8Partner's K1 Calendar Year Amount
- P9Current Mortgage Principal Balance
- PAPayment Cancellation Total
- PBBilled Amount
- PCPositive Collected Balance
- PEPlan Period Election
- PFPrincipal
- PGPayoff
- PHPer Occurrence Deductible
- PIPer Occurrence Monthly Limit
- PLPositive Ledger Balance
- PMLast Premium Amount
- PNPrior Gross Invoice Total
- POPercent Override
- PPPayment Prior to Advance
- PQAdvance Amount
- PRPer Occurrence Limit
- PSPer Occurrence per Day Limit
- PTPer Occurrence Aggregate Limit
- PWPer Occurrence Maximum per Week Limit
- PXPer Person Maximum per Week Limit
- PYPer Person per Day Limit
- PZOriginal Principal Balance
- Q1Proposed
- QNQuarterly Net Fee Position (Excess/Deficit)
- RBPer Person Deductible
- RCRefund Check
- RDPer Person Limit
- RHPer Person Aggregate Limit
- RPRepair
- RRReserve Requirement Amount
- RSReserves
- RTLast Payment
- RWTotal Delinquency
- RZLender's Total Delinquency
- S1Salary Amount
- S2Salary with Bonuses
- S3Salary with Commissions
- S4Salary with Subchapter S Corporation Income
- S5Salary with Partner's Bonuses
- S6Subchapter S Corporation
- S7Sole Proprietorship
- SACampaign Summary Amount
- SBStated Amount
- SCTotal Service Charge
- SEService Charges Which Cannot Be Compensated by Balances
- SISubsequent Interest Payment Amount
- SMSupplemental
- SSCampaign Summary Amount to be Shared
- STState
- T1Teacher
- T2Total Claim Before Taxes
- T3Total Submitted Charges
- TATotal Annual Sales
- TBTotal Annual Sales to Customer
- TCProposed Cost
- TDProposed Profit
- TEProposed Fee
- TFTotal Proposed Price
- TGAlternate Proposed Price
- TLTotal Prior Loan Amount Owed
- TMTime and Expense Paid Current Month
- TPTotal payment amount
- TSTotal Sales
- TTTotal Transaction Amount
- TXTotal to Date
- TYTotal at Complete
- U2Ingredient Cost Claimed
- UAUnliquidated Amount
- UBUnpaid Principal Balance
- UCUnspecified Aggregate Limit
- UGTotal Unpaid Principal Balance for Stafford Loans
- UPTotal Unpaid Principal Balance for Parental Loans for Students
- USTotal Unpaid Principal Balance for Supplemental Loans for Students
- W1W-2
- W2W-2 with Bonuses
- W3W-2 with Deferred Compensation
- W4W-2 without Bonuses
- WKPer Week Limit
- Y1Year to Date Eligible Salary
- Z1Repackaging Labor Cost
- Z2Repackaging Material Cost
- Z3Unit Cost of Discrepant Material
- ZAFederal Medicare or Medicaid Claim Mandate - Category 1
- ZBFederal Medicare or Medicaid Claim Mandate - Category 2
- ZCFederal Medicare or Medicaid Claim Mandate - Category 3
- ZDFederal Medicare or Medicaid Claim Mandate - Category 4
- ZEFederal Medicare or Medicaid Claim Mandate - Category 5
- ZFFederal Pension Mandate - Category 1
- ZGFederal Pension Mandate - Category 2
- ZHFederal Pension Mandate - Category 3
- ZIFederal Pension Mandate - Category 4
- ZJFederal Pension Mandate - Category 5
- ZKFederal Medicare or Medicaid Payment Mandate - Category 1
- ZLFederal Medicare or Medicaid Payment Mandate - Category 2
- ZMFederal Medicare or Medicaid Payment Mandate - Category 3
- ZNFederal Medicare or Medicaid Payment Mandate - Category 4
- ZOFederal Medicare or Medicaid Payment Mandate - Category 5
- ZZMutually Defined
Code indicating reason for credit memo, or adjustment to invoice, credit memo, or payment.
Codes (248)- 10Pallet/Container Charge Error
- 11Returns - Damage
- 12Returns - Quality
- 13Returns - Dating
- 14Returns - Promotion
- 15Returns - Recall
- 16Non-Invoice Related Allowance/Charge
- 17Required Data Missing
- 18Not Company Bill
- 19Duplicate Billing
- 20Balance Due Declined
- 21Shipment Method of Payment Incorrect
- 22Weight Error
- 23Special Charge Not Authorized
- 24Incorrect Discount
- 25Item Not Accepted
- 26Invoice Cancelled
- 27Product Transfers Subject to Charge Back
- 28Rebated Shipments
- 29Fee Incorrect
- 30Delivery Charge Incorrect
- 31Pickup Charge Incorrect
- 32Oversize Premium Invalid
- 33Currency Exchange Incorrect
- 34Declared Value Incorrect
- 35Commodity Code Incorrect
- 36Scale Number Incorrect
- 37Dimensions Incorrect
- 38Service Incorrect
- 39Shipper/Consignee Ref. Number Missing
- 40Address Incorrect
- 41Item Not Accepted-Delay
- 42Item Not Accepted - Loss
- 43Missing Discount
- 44Required Documents Missing
- 45Stale Bill Over 180 Days Old
- 46Transportation Charge Incorrect
- 47Advanced Charge Incorrect
- 48Service Charge
- 49Processing Charge
- 50Late Charge
- 51Interest Penalty Charge
- 52Credit for Overpayment
- 53Remittance for Previous Underpayment
- 54Freight Deducted
- 55Tax Deducted
- 56Advertising Allowance Taken
- 57Volume Discount Taken
- 58Invoice billing received after final billing
- 59Item not received
- 60No open item on file
- 61No open order on file
- 62Material/Item Description Error
- 63Customer Paid Invoice Which Was Previously Disputed
- 64Sale of Property
- 65Claim Paid on Appraisal
- 66Disability Insurance or Income
- 67
- 68Death Benefit Reduction
- 69Employer Provided Pension
- 70Advanced Ship Notice Not Received
- 71Advertising Allowance
- 72Authorized Return
- 73Bill of Lading Not Received
- 74Cancel or Adjust Prior Credit/Debit Adjustment
- 75Total Order Not Received
- 76Cash Discount
- 77Competitive Allowance
- 78Competitive Price
- 79Cooperative Advertising
- 80Overpayment
- 81Credit as Agreed
- 82Defective Allowance
- 83Evaluated Receipt Settlement (ERS) Delivery Charge
- 84Deviation from Order Date
- 85Distribution Discount/Allowance
- 86Duplicate Payment
- 87Duplicate Shipment
- 88Duty Charge Variance
- 89Early Buy Allowance
- 90Early Payment Allowance
- 91Engraving Charge
- 92Merchandise Not Ordered
- 93Field Destroy
- 94Fixtures Charge
- 95Floor Stock Protection
- 96Goods to Follow
- 97Handling Charge
- 98Labor Charges
- 99Late Shipment of Goods
- 01Pricing Error
- 02Allowance/Charge Error
- 03Extension Error
- 04Item Not Accepted - Damaged
- 05Item Not Accepted - Quality
- 06Quantity Contested
- 07Incorrect Product
- 08Substitute Product
- 09Terms of Sale Error
- A1Layout/Design Charge
- A2Misshipped (Wrong Product Received)
- A3New Store Allowance
- A4Nonreceipt of Goods
- A5Overage
- A6Packing Violations
- A7Payment on Account
- A8Promotional Allowance
- A9Proof of Delivery Not Received
- AAPrepaid Benefit or Advances
- ABPartial Wage Continuation
- ACApportionment or Contribution
- ADNon-Automated Credit Card Transaction
- AEUnemployment Compensation
- ANAuto No Fault
- B1Proof of Shipment Not Received
- B2Rebate
- B3Recovery Allowance
- B4Refurbishing Charge
- B5Repair of Goods
- B6Repay Discount
- B7Restocking Charge
- B8Routing Violation
- B9Samples Not Received
- BRBenefit Rate
- C1Settlement of Account
- C2Special Allowance
- C3Special Finish
- C4Stock Balance
- C5Temporary Allowance
- C6Testing Charge
- C7Third Party Allowance
- C8Ticketing Error
- C9Ticketing Service
- CACancelled Promotion
- CCExcess Packaging – Cardboard Layer
- CDExcess Packaging - Pins
- CEEmployer's Legal Expenses Paid to Date
- CFExcess Packaging - String
- CGExcess Packaging - Tiebacks
- CHProduct Quality - Excess Wrinkling
- CISize Indicator Strips - Missing
- CJSize Indicator Strips - Improper Placement
- CKValuation As Of
- CLSize Indicator Strips - Incorrect Size Information
- CNItem Tickets - Incorrect Information Zone 1 - Description
- COAdjusted Compensation Rate
- CPEmployer Paid Benefits due
- CQChange
- D1Transfer Between Accounts
- D2Transportation Direct Billing
- D3Unauthorized Deduction
- D4Unauthorized Product
- D5Volume Discount
- D6Recovery of Standard Allowances
- D7Cost Associated with Reworked Material
- D8Count and Recount Allowance
- D9Store Stock Price Protection
- DBPension or Retirement Plan Disability Benefits
- DCCanadian Pension Plan
- DDRailroad Disability
- DFFamily Social Security
- DISocial Security Supplemental Income
- DJJones Act (Merchant Seaman Injured on the Job)
- DOOther Group Insurance
- DPPension or Retirement Benefits
- DRSocial Security Retirements
- DSSocial Security Disability
- DTRailroad Retirement
- DVCivil Servants Plan
- DWSubrogation
- E1Recoupment
- E2Covered By Debit Memo
- E3Withholding
- E4Warehouse Stock Price Protection
- E5Invoice Price Protection
- E6Goods and Services Tax 0% Rate, International Documentation Will Follow
- E7Goods and Services Tax Decreased Due to Billing Error
- E8Goods and Services Tax Increased Due to Billing Error
- E9Order Cancelled
- F1Defective
- F3Social Security
- F4No-Fault
- F5Other Long-term Disability Offset
- F6Indirect Offset Excess
- F7Black Lung Disease
- F8Rehabilitation
- F9Educational Benefit
- G1Profit Sharing
- G2Workmen's Compensation
- G3Pension
- G4Other Disability Plan
- G5Other Income
- G6Salary Continuance
- G7Short-term Disability
- G8Permanent and Total Disability
- G9State Disability Plan
- H1Information Forthcoming
- H2Payment Previously Sent
- H3Loan Paid in Full
- H4Bill Insured
- H5Loan Service Released
- H6Partial Payment Remitted
- H7Payment Forthcoming
- H8Bill Mortgagee
- H9Coverage Summary Needed
- J1Nonreimbursable
- J2Transportation Discrepancy Report (TDR) Submitted
- J3Promised Adjustment Not Received
- J4Deficiency Report Authorized Adjustment
- J5Duplicate Summary Billing (Same Bill Number)
- J6Duplicate Summary Billing (Different Bill Number)
- J7Duplicate Summary Billing (Second Billing)
- J8Unable to Process
- J9Noninterfund Bill
- K1Other Coverage Placed
- K2Invalid Policy Number
- K3Renewal Not Received
- L1Audit
- L2Discount
- L3Penalty
- L4Administrative Fees
- L5Interest Due
- L6Interest Owed
- L7Miscellaneous Deductions
- L8Miscellaneous Credits
- L9Military Distribution Adjustment
- LPLate Payment
- M1Advertising - Unidentified
- M2Commissions Deductions
- M3Gift Certificates
- M4Salary Deduction
- PDPaid to Date
- PPQuebec Pension Plan
- W6Safety Violations
- W7
- W8Intoxication
- W9Noncooperation: Rehabilitation, Training, Education, Medical
- WAActual Reduced Earnings
- WBRegular Wage Minus Disability Benefit
- WCSubrogation Recovery
- WOOverpayment Recovery
- WRDeemed Reduced Earnings
- WSSpecial Fund Recovery
- WTDeductibles Recovery
- WUUnspecified Recovery
- WWOverpayment Credit
- WYContinuous Disability Period
- ZZMutually Defined