Segment
X12 EDI Release 00304
To identify resource details for activities
Elements
Code specifying the type of quantity.
Codes (326)- 10Cumulative Quantity - Rejected Material: Disposition Pending
- 11Split Quantity
- 12Ship Notice Quantity
- 13Collateral Requirements
- 14Quantity in Float
- 15Quantity in Hold Out
- 16Line Thread Quantity
- 17Quantity on Hand
- 18Previous Week Quantity
- 19Unverified Receipts
- 20Unusable Quantity
- 21Cumulative Quantity Shipped Short - Disposition Pending
- 22Cumulative Quantity Shipped Short - Disposition Challenged
- 23Cumulative Quantity Shipped Long - Disposition Pending
- 24Cumulative Quantity Shipped Long - Disposition Challenged
- 25OEM Inventory
- 26Total Inventory
- 27Committed Quantity
- 28Quantity Available for Return
- 29Projected Available Inventory
- 30Quote Quantity on Inventory
- 31Additional Demand Quantity
- 32Quantity Sold
- 33Quantity Available for Sale (stock quantity)
- 34Noncommitted Inventory on Shelf
- 35Inventory on Shelf + Work in Progress
- 36Distributor Inventory
- 37Work In Process
- 38Original Quantity
- 39Shipped Quantity
- 40Remaining Quantity
- 41Number of Batches
- 42Number of Checks
- 45Cumulative quantity on order
- 46Total transactions
- 47Primary Net Quantity
- 48Secondary Net Quantity
- 49Number of Signed Bills of Lading
- 50Number of Copies of Bill of Lading
- 51Number of Unsigned Bills of Lading
- 52Number of Originals
- 53Original payment item count.
- 54Bank reject item count.
- 55Net to pay item count.
- 56Minimum Contract Quantity
- 57Minimum Order Quantity
- 58Payment Cancellation Item Count
- 60Total Authorized Quantity
- 61Remaining Authorized Quantity
- 62Number of Days Covered by Inventory
- 63On Order Quantity
- 64Past Due Quantity
- 65Previous Month's Usage
- 66Minimum Fabrication Quantity
- 67Minimum Ship Quantity
- 68Maximum Number of Shipments Allowed
- 69Incremental Order Quantity
- 70Maximum Order Quantity
- 72Minimum Stock Level
- 73Maximum Stock Level
- 74Damaged Goods
- 75Receipts
- 76Returns
- 77Stock Transfers In
- 78Stock Transfers Out
- 79Billing Unit(s) Per Pricing Unit
- 80Pricing Unit(s) Per Billing Unit
- 81Prepaid Quantity Shipped
- 82Prepaid Quantity Not Shipped
- 83Submitted Quantity Sold
- 84Submitted Quantity Returned
- 85Lot Size
- 86Nonconformance Quantity
- 87Quantity Received
- 88Beds
- 89Operating Beds
- 90Acknowledged Quantity
- 91Additional Usage Quantity
- 92Allotted Usage Quantity
- 93Attendant-Handled Quantity
- 94Billable Quantity
- 95Data Storage Quantity
- 96Non-Billable Quantity
- 97Non-Urgent Delivery Quantity
- 98Overflow Quantity
- 99Quantity Used
- 01Discrete Quantity
- 02Cumulative Quantity
- 03Discreet Quantity - Rejected Material
- 04Discrete Quantity - Rejected Material: Disposition Replacement
- 05Discrete Quantity - Rejected Material: Disposition Credit
- 06Discrete Quantity - Rejected Material: Disposition Pending
- 07Cumulative Quantity - Rejected Material
- 08Cumulative Quantity - Rejected Material: Disposition Replacement
- 09Cumulative Quantity - Rejected Material: Disposition Credit
- 1AOriginal Duration (in calendar units)
- 1BCurrent Duration (in calendar units)
- 1CRemaining Duration (in calendar units)
- 1DTotal Float (in calendar units)
- 1EFree Float (in calendar units)
- 1FLag (as in Lag Time - in calendar units)
- 1GLead Time (in calendar units)
- 1HStarted
- 1ICompleted
- 1JDue
- 1KTime Units
- 1LShifts
- 1MTime units per shift
- 1NScrap allowed
- 1OCalendar Units
- 1PResource (Quantity) available
- 1QTotal Resource (Quantity)
- 1RLevel Resource (Quantity)
- 1SLate
- 1TNumber of Delinquent Installments
- 1UNumber of Loans
- 1VTotal Number of Mortgagees
- 1WTotal Number of Loan Detail Records
- 1XPrescription Effective Period
- A1Acceptable Unserviceable Quantity
- A2Optimistic Duration
- A3Most Likely Duration
- A4Pessimistic Duration
- A5Adjusted Quantity
- A6Accidents
- AAUnacknowledged Quantity
- ABUrgent Delivery Quantity
- ACVoice Storage Quantity
- ADMaintenance Units
- AEMinimum Average Time Requirement (MATR) Units
- AFWide Area Telephone Service (WATS)/800 Service Units
- AGNumber of End Users
- AHNumber of Message Recipients
- AINumber of Operator Credits
- AJDaily Adjustments
- AOVerified Receipts
- APOrder Quantity Multiple
- AQContribution Total
- ARLoan Repayment Total
- ASParticipant Total
- ATActual
- AUCumulative Actual
- AVBudget
- AWCumulative Budget
- AXNumber of Insured Lives
- AYForecast
- AZForecast at Complete
- BADue-In
- BCBudget At Complete
- BFAge Modifying Units
- BIBook Inventory
- BQBackorder Quantity
- BRBlood Record
- CACovered - Actual
- CBClosing Statement Balance
- CDCo-insured - Actual
- CECovered - Estimated
- CFCo-insured - Estimated
- CGCumulative Gas Volume
- CHCumulative Effect of Prior Period Adjustment
- CICumulative Gas Injection Volume
- CLCumulative Liquid Injection Volume
- COCumulative Oil/Condensate Volume
- CPCurrent Period Imbalance
- CRCertified Registered Nurse Anesthetist (CRNA) Number of Concurrent Procedures
- CSCurrent Service Life
- CWCumulative Water Volume
- D3Number of Co-insurance Days
- DBDeductible Blood Units
- DODays Operated
- DPDays Produced
- DRDirect Workers
- DTDependent Total
- DYDays
- E1Course Segments
- E2Degree Segments
- ECUse of Extracorporeal Circulation
- EMEmergency Modifying Units
- EPProduct Exchange Amount
- ETEmployee Total
- FBFurnished Blood Units
- FCFuel Consumed or Burned Amount
- FTForecast to Complete
- GIGas Injection Volume
- GLGas Lift Volume
- GTGrade Transfer Amount
- GVGas Volume
- HMUse of Hypothermia
- HOUse of Hypotension
- HPUse of Hyperbaric Pressurization
- HRUse of Hypertension
- HSHours
- IINumber of Irregular Interest Payments
- INIndirect Workers
- IPNumber of Interest Payments
- IQIn-Transit Quantity
- ITIntertank Transfer Amount
- K6Drafts
- KAEstimated
- KBNet Quantity Increase
- KCNet Quantity Decrease
- KDExpenditure Quantity
- KEOriginals
- KFDuplicates
- LALife-time Reserve - Actual
- LBLoss Allowance
- LELife-time Reserve - Estimated
- LGLoss or Gain
- LILiquid Injection Volume
- LPLease Periods
- LTTariff Loss Allowance
- LVOil/Condensate Volume
- MAMiscellaneous Allowance
- MIMiles
- MNMonth
- MQMaximum Ship Quantity
- NANumber of Non-covered Days
- NCNumber of Claimants
- NENon-Covered - Estimated
- NNNumber of Hospitals
- NONumber of Physicians
- NPNumber of Members
- NQNumber of Franchisees
- NRNot Replaced Blood Units
- NSNumber of Stations
- OIOpening Statement Balance
- OROriginal
- OTNumber of Operating Periods at Failure
- P3Physical Status III
- P4Physical Status IV
- P5Physical Status V
- P6Number of Services or Procedures
- PAPipeline Adjustment or Allowance
- PBPressure Base
- PCPrior Cumulative Imbalance
- POPercentage of Ordered Quantity
- PPPurchase of Product
- PQCumulative Quantity Required Prior to the First Scheduled Period
- PRRequirement Quantity that was Previously Released
- PSPrescription
- PXPrior Units Accepted
- QAQuantity Approved
- QBQuantity Dispensed
- QCQuantity Disapproved
- QDQuantity Delivered
- QEQuantity Deferred
- QFHigh Fabrication Authorization Quantity
- QHQuantity on Hold
- QPQuantity by Position
- QRHigh Raw Material Authorization Quantity
- QSQuantity Per Skid
- QUQuantity Serviced
- RARefills Authorized
- RBReplaced Blood Units
- SGSwan-Ganz
- SPDays Supply
- SQProduct Sales Amount
- STStandard
- TATank Allowance
- TCTotal at Complete
- TDTotal to Date
- TENumber of Theatres
- TOTotal
- TRTrips
- V1Retention Quantity
- V2Available Quantity
- V3Transfer Quantity
- VAVolume Shrinkage Adjustment or Allowance
- VRVariance
- VSVisits
- WVWater Volume
- XATotal of Issuable Assets
- XBTotal System Backorder Quantity, High Priority
- XCTotal Service Backorder Quantity, High Priority
- XDTotal System Backorder Quantity, Low Priority
- XETotal Service Backorder Quantity, Low Priority
- XGOn Hand and Due-In
- XJOther War Reserve Material Requirements Protectable (OWRMRP) Quantity
- XTProtected Quantity
- XUReserved
- XVRequisitioning Objective
- XXAuthorized Retention Level
- XYSafety Level
- XZBackorder Lines
- YATotal Demand Quantity
- YBTotal Demand Orders
- YCFirst Quarter Recurring Demand
- YDFirst Quarter Recurring Orders
- YEFirst Quarter Non-recurring Demand
- YFFirst Quarter Non-recurring Orders
- YGSecond Quarter Recurring Demand
- YHSecond Quarter Recurring Orders
- YJSecond Quarter Non-recurring Demand
- YKSecond Quarter Non-recurring Orders
- YLThird Quarter Recurring Demand
- YMThird Quarter Recurring Orders
- YNThird Quarter Non-recurring Demand
- YPThird Quarter Non-recurring Orders
- YQFourth Quarter Recurring Demand
- YRFourth Quarter Recurring Orders
- YSFourth Quarter Non-recurring Demand
- YTFourth Quarter Non-recurring Orders
- YWReorder Point Quantity
- YXContract Line Item Quantity
- YYYears
- Z1Units Worked Last Day
- Z2Units Worked per Week
- Z3Units Worked per Quarter
- Z4Number Weeks Paid
- Z6Unused Accumulated Sick Days
- ZAFederal Medicare or Medicaid Claim Mandate - Category 1
- ZBFederal Medicare or Medicaid Claim Mandate - Category 2
- ZCFederal Medicare or Medicaid Claim Mandate - Category 3
- ZDFederal Medicare or Medicaid Claim Mandate - Category 4
- ZEFederal Medicare or Medicaid Claim Mandate - Category 5
- ZFFederal Pension Mandate - Category 1
- ZGFederal Pension Mandate - Category 2
- ZHFederal Pension Mandate - Category 3
- ZIHolding Period
- ZJFederal Pension Mandate - Category 5
- ZKFederal Medicare or Medicaid Payment Mandate - Category 1
- ZLFederal Medicare or Medicaid Payment Mandate - Category 2
- ZMFederal Medicare or Medicaid Payment Mandate - Category 3
- ZNFederal Medicare or Medicaid Payment Mandate - Category 4
- ZOFederal Medicare or Medicaid Payment Mandate - Category 5
- ZPFederal Pension Mandate - Category 4
Code specifying the units in which a value is being expressed, or manner in which a measurement has been taken
Codes (719)- 10Group
- 11Outfit
- 12Packet
- 13Ration
- 14Shot
- 15Stick
- 16115 Kilogram Drum
- 17100 Pound Drum
- 1855 Gallon Drum
- 19Tank Truck
- 2020 Foot Container
- 2140 Foot Container
- 22Deciliter per Gram
- 23Grams per Cubic Centimeter
- 24Theoretical Pounds
- 25Grams per Square Centimeter
- 26Actual Tons
- 27Theoretical Tons
- 28Kilograms per Square Meter
- 29Pounds per 1000 Square Feet
- 30Horsepower Days per Air Dry Metric Tons
- 31Catchweight
- 32Kilograms per Air Dry Metric Tons
- 33Kilopascal Square Meters per Gram
- 34Kilopascals per Millimeter
- 35Milliliters per Square Centimeter Second
- 36Cubic Feet per Minute per Square Foot
- 37Ounces per Square Foot
- 38Ounces per Square Foot per 0.01 Inch
- 40Milliliter per Second
- 41Milliliter per Minute
- 43Super Bulk Bag
- 44500 Kilogram Bulk Bag
- 45300 Kilogram Bulk Bag
- 4625 Kilogram Bulk Bag
- 4750 Pound Bag
- 48Bulk Car Load
- 50Actual Kilograms
- 51Actual Tonnes
- 53Theoretical Kilograms
- 54Theoretical Tonnes
- 56Sitas
- 57Mesh
- 58Net Kilograms
- 59Parts Per Million
- 60Percent Weight
- 61Parts Per Billion
- 62Percent Per 1000 Hours
- 63Failure Rate In Time
- 64Pounds Per Square Inch Gauge
- 65Coulomb
- 66Oersteds
- 67Siemens
- 68Ampere
- 69Test Specific Scale
- 70Volt
- 71Volt-Ampere Per Pound
- 72Watts Per Pound
- 73Ampere Turn Per Centimeter
- 74Milli Pascals
- 76Gauss
- 77Mil
- 78Kilogauss
- 79Electron Volt
- 80Pounds Per Square Inch Absolute
- 81Henry
- 82Ohm
- 83Farad
- 84Kilo Pounds Per Square Inch (KSI)
- 85Foot Pounds
- 86Joules
- 87Pounds per Cubic Foot
- 89Poise
- 90Saybold Universal Second
- 91Stokes
- 92Calories per Cubic Centimeter
- 93Calories per Gram
- 94Curl Units
- 9520,000 Gallon Tankcar
- 9610,000 Gallon Tankcar
- 9710 Kilogram Drum
- 9815 Kilogram Drum
- 01Actual Pounds
- 02Statute Mile
- 03Seconds
- 04Small Spray
- 05Lifts
- 08Heat Lots
- 1ACar Mile
- 1BCar Count
- 1CLocomotive Count
- 1DCaboose Count
- 1EEmpty Car
- 1FTrain Mile
- 1GFuel Usage (Gallons)
- 1HCaboose Mile
- 1IFixed Rate
- 1JTon Miles
- 1KLocomotive Mile
- 1LTotal Car Count
- 1MTotal Car Mile
- 1XQuarter Mile
- 2ARadians Per Second
- 2BRadians Per Second Squared
- 2CRoentgen
- 2FVolts Per Meter
- 2GVolts (Alternating Current)
- 2HVolts (Direct Current)
- 2IBritish Thermal Units (BTUs) Per Hour
- 2JCubic Centimeters Per Second
- 2KCubic Feet Per Hour
- 2LCubic Feet Per Minute
- 2MCentimeters Per Second
- 2NDecibels
- 2PKilobyte
- 2QKilobecquerel
- 2RKilocurie
- 2UMegagram
- 2VMegagrams Per Hour
- 2WBin
- 2XMeters Per Minute
- 2YMilliroentgen
- 2ZMillivolts
- 3ADegrees Lovibond
- 3BMegajoule
- 3CManmonth
- 3EPounds Per Pound of Product
- 3FKilograms Per Liter of Product
- 3GPounds Per Piece of Product
- 3HKilograms Per Kilogram of Product
- 3IKilograms Per Piece of Product
- 4ABobbin
- 4BCap
- 4CCentistokes
- 4DCurie
- 4E20-Pack
- 4F100-Pack
- 4GMicroliter
- 4H
- 4IMeters Per Second
- 4JMeters Per Second Per Second
- 4KMilliamperes
- 4LMegabyte
- 4MMilligrams Per Hour
- 4NMegabecquerel
- 4OMicrofarad
- 4PNewtons Per Meter
- 4QOunce Inch
- 4ROunce Foot
- 4SPascal
- 4TPicofarad
- 4UPounds Per Hour
- 4VCubic Meter Per Hour
- 4WTon Per Hour
- 4XKiloliter Per Hour
- 5ABarrels per Minute
- 5BBatch
- 5CGallons per Thousand
- 5EMMSCF/Day
- 5FPounds per Thousand
- 5GPump
- 5HStage
- 5IStandard Cubic Foot
- 5JHydraulic Horse Power
- 5KCount per Minute
- 5PSeismic Level
- 5QSeismic Line
- A8Dollars per Hours
- A9Millipoises
- AABall
- ABBulk Pack
- ACAcre
- ADBytes
- AEAmperes per Meter
- AFCentigram
- AHAdditional Minutes
- AIAverage Minutes Per Call
- AJCop
- AKFathom
- ALAccess Lines
- AMAmpoule
- ANMinutes or Messages
- APAluminum Pounds Only
- AQAnti-hemophilic Factor (AHF) Units
- ARSuppository
- ASAssortment
- ATAtmosphere
- AUOcular Insert System
- AVCapsule
- AWPowder-Filled Vials
- AXTwenty
- AYAssembly
- AZBritish Thermal Units (BTUs) per Pound
- B0British Thermal Units (BTUs) per Cubic Foot
- B1Barrels per Day
- B2Bunks
- B3Batting Pound
- B4Barrel, Imperial
- B5Billet
- B6Bun
- B7Cycles
- B8Board
- B9Batt
- BABale
- BBBase Box
- BCBucket
- BDBundle
- BEBeam
- BFBoard Feet
- BGBag
- BHBrush
- BIBar
- BJBand
- BKBook
- BLBlock
- BMBolt
- BNBulk
- BOBottle
- BP100 Board Feet
- BQBrake horse power
- BRBarrel
- BSBasket
- BTBelt
- BUBushel
- BVBushel, Dry Imperial
- BWBase Weight
- BXBox
- BYBritish Thermal Unit (BTU)
- BZMillion BTUs/Dekatherm
- C0Calls
- C1Composite Product Pounds (Total Weight)
- C2Carset
- C3Centiliter
- C4Carload
- C5Cost
- C6Cell
- C7Centipoise (CPS)
- C8Cubic Decimeter
- C9Coil Group
- CACase
- CBCarboy
- CCCubic Centimeter
- CDCarat
- CECentigrade, Celsius
- CFCubic Feet
- CGCard
- CHContainer
- CICubic Inches
- CJCone
- CKConnector
- CLCylinder
- CMCentimeter
- CNCan
- COCubic Meters (Net)
- CPCrate
- CQCartridge
- CRCubic Meter
- CSCassette
- CTCarton
- CUCup
- CVCover
- CWHundred Pounds (CWT)
- CXCoil
- CYCubic Yard
- CZCombo
- D3Square Decimeter
- D5Kilogram Per Square Centimeter
- D8Draize Score
- D9Dyne per Square Centimeter
- DADays
- DBDry Pounds
- DCDisk (Disc)
- DDDegree
- DEDeal
- DFDram
- DGDecigram
- DHMiles
- DIDispenser
- DJDecagram
- DKKilometers
- DLDeciliter
- DMDecimeter
- DNDeci Newton-Meter
- DODollars, U.S.
- DPDozen Pair
- DQData Records
- DRDrum
- DSDisplay
- DTDry Ton
- DUDyne
- DXDynes per Centimeter
- DYDirectory Books
- DZDozen
- E1Hectometer
- E3Inches, Fraction-Average
- E4Inches, Fraction-Minimum
- E5Inches, Fraction-Actual
- E7Inches, Decimal-Average
- E8Inches, Decimal-Actual
- E9English, (Feet, Inches)
- EAEach
- EBElectronic Mail Boxes
- ECEach per Month
- EDInches, Decimal-Nominal
- EFInches, Fraction-Nominal
- EMInches, Decimal-Minimum
- EPEleven pack
- EQEquivalent Gallons
- EVEnvelope
- EXFeet, Inches and Fraction
- EYFeet, Inches and Decimal
- EZFeet and Decimal
- F1Thousand Cubic Feet Per Day
- F9Fibers per Cubic Centimeter of Air
- FAFahrenheit
- FBFields
- FCBlister Pak
- FDMillion Particles per Cubic Foot
- FETrack Foot
- FFHundred Cubic Meters
- FGTransdermal Patch
- FHMicromolar
- FLFlake Ton
- FMMillion Cubic Feet
- FOFluid Ounce
- FPPounds per Sq. Ft.
- FRFeet Per Minute
- FSFeet Per Second
- FTFoot
- FZFluid Ounce (Imperial)
- G2U.S. Gallons Per Minute
- G3Imperial Gallons Per Minute
- G4Gigabecquerel
- G5Gill (Imperial)
- G7Microfiche Sheet
- GAGallon
- GBGallons/Day
- GCGrams per 100 Grams
- GDGross Barrels
- GEPounds per Gallon
- GFGrams per 100 Centimeters
- GGGreat Gross (Dozen Gross)
- GHHalf Gallon
- GIImperial Gallons
- GJGrams per Milliliter
- GKGrams per Kilogram
- GLGrams per Liter
- GMGrams per Sq. Meter
- GNGross Gallons
- GOMilligrams per Square Meter
- GPMilligrams per Cubic Meter
- GQMicrograms per Cubic Meter
- GRGram
- GSGross
- GTGross Kilogram
- GVGigajoules
- GWGallons Per Thousand Cubic Feet
- GXGrain
- GYGross Yard
- GZGage Systems
- H1Half Pages - Electronic
- H2Half Liter
- H4Hectoliter
- HAHank
- HBHundred Boxes
- HCHundred Count
- HDHalf Dozen
- HEHundredth of a Carat
- HFHundred Feet
- HGHectogram
- HHHundred Cubic Feet
- HIHundred Sheets
- HJHorsepower
- HKHundred Kilograms
- HLHundred Feet - Linear
- HMMiles Per Hour
- HNMillimeters of Mercury
- HOHundred Troy Ounces
- HPMillimeter H20
- HRHours
- HSHundred Square Feet
- HTHalf Hour
- HUHundred
- HVHundred Weight (Short)
- HWHundred Weight (Long)
- HYHundred Yards
- HZHertz
- IAInch Pound
- IBInches Per Second (Vibration Velocity)
- ICCounts per Inch
- IEPerson
- IFInches of Water
- IIColumn-Inches
- ILInches per Minute
- IMImpressions
- INInch
- IPInsurance Policy
- ITCounts per Centimeter
- IUInches Per Second (Linear Speed)
- IVInches Per Second Per Second (Acceleration)
- IWInches Per Second Per Second (Vibration Acceleration)
- J2Joule Per Kilogram
- JBJumbo
- JEJoule Per Kelvin
- JGJoule per Gram
- JKMega Joule per Kilogram
- JMMegajoule/Cubic Meter
- JOJoint
- JRJar
- JUJug
- K1Kilowatt Demand
- K2Kilovolt Amperes Reactive Demand
- K3Kilovolt Amperes Reactive Hour
- K4Kilovolt Amperes
- K5Kilovolt Amperes Reactive
- K6Kiloliter
- K7Kilowatt
- KACake
- KBKilocharacters
- KCKilograms per Cubic Meter
- KDKilograms Decimal
- KEKeg
- KFKilopackets
- KGKilogram
- KHKilowatt Hour
- KIKilograms/Millimeter Width
- KJKilosegments
- KK100 Kilograms
- KLKilograms/Meter
- KMKilograms per Square Meter, Kilograms, Decimal
- KOMillequivalence Caustic Potash per Gram of Product
- KPKilometers Per Hour
- KQKilopascal
- KRKiloroentgen
- KS
- KTKit
- KVKelvin
- KWKilograms per Millimeter
- KXMilliliters per Kilogram
- L2Liters Per Minute
- LAPounds Per Cubic Inch
- LBPound
- LCLinear Centimeter
- LD
- LELite
- LFLinear Foot
- LGLong Ton
- LHLabor Hours
- LILinear Inch
- LJLarge Spray
- LKLink
- LMLinear Meter
- LNLength
- LOLot
- LPLiquid Pounds
- LQLiters Per Day
- LRLayer(s)
- LSLump Sum
- LTLiter
- LXLinear Yards Per Pound
- LYLinear Yard
- M0Magnetic Tapes
- M1Milligrams per Liter
- M2Millimeter-Actual
- M3Mat
- M4Monetary Value
- M5Microcurie
- M6Millibar
- M7Micro Inch
- M8Mega Pascals
- M9Million British Thermal Units per One Thousand Cubic Feet
- MAMachine/Unit
- MBMillimeter-Nominal
- MCMicrogram
- MDAir Dry Metric Ton
- MEMilligram
- MFMilligram per Sq. Ft. per Side
- MGMetric Gross Ton
- MHMicrons (Micrometers)
- MIMetric
- MJMinutes
- MKMilligrams Per Square Inch
- MLMilliliter
- MMMillimeter
- MNMetric Net Ton
- MOMonths
- MPMetric Ton
- MQ1000 Meters
- MRMeter
- MSSquare Millimeter
- MTMetric Long Ton
- MUMillicurie
- MVNumber of Mults
- MWMetric Ton Kilograms
- MXMixed
- MYMillimeter-Average
- MZMillimeter-minimum
- N1Pen Calories
- N2Number of Lines
- N3Print Point
- N4Pen Grams (Protein)
- N6Megahertz
- NAMilligrams per Kilogram
- NBBarge
- NCCar
- NDNet Barrels
- NENet Liters
- NFMessages
- NGNet Gallons
- NHMessage Hours
- NINet Imperial Gallons
- NJNumber of Screens
- NLLoad
- NMNautical Mile
- NNTrain
- NQMho
- NRMicro Mho
- NSShort Ton
- NTTrailer
- NUNewton-Meter
- NVVehicle
- NWNewton
- NXParts Per Thousand
- NYPounds Per Air-Dry Metric Ton
- OAPanel
- ONOunces per Square Yard
- OPTwo pack
- OTOvertime Hours
- OZOunce - Av
- P0Pages - Electronic
- P1Percent
- P2Pounds per Foot
- P3Three pack
- P4Four-pack
- P5Five-pack
- P6Six pack
- P7Seven pack
- P8Eight-pack
- P9Nine pack
- PAPail
- PBPair Inches
- PCPiece
- PDPad
- PEPounds Equivalent
- PFPallet (Lift)
- PGPounds Gross
- PHPack (PAK)
- PIPitch
- PJPounds, Decimal - Pounds per Square Foot - Pound Gage
- PKPackage
- PLPallet/Unit Load
- PMPounds-Percentage
- PNPounds Net
- POPounds per Inch of Length
- PPPlate
- PQPages per Inch
- PRPair
- PSPounds per Sq. Inch
- PTPint
- PUMass Pounds
- PVHalf Pint
- PWPounds per Inch of Width
- PXPint, Imperial
- PYPeck, Dry U.S.
- PZPeck, Dry Imperial
- Q1Quarter (Time)
- Q2Pint U.S. Dry
- Q3Meal
- Q4Fifty
- Q5Twenty-Five
- Q6Thirty-Six
- Q7Twenty-Four
- QAPages - Facsimile
- QBPages - Hardcopy
- QDQuarter Dozen
- QHQuarter Hours
- QKQuarter Kilogram
- QRQuire
- QSQuart, Dry U.S.
- QTQuart
- QUQuart, Imperial
- R1Pica
- R2Becquerel
- R3Revolutions Per Minute
- R4Calorie
- R5Thousands of Dollars
- R6Millions of Dollars
- R7Billions of Dollars
- R9Thousand Cubic Meters
- RARack
- RDRod (length) - 5.5 Yards
- REReel
- RGRing
- RHRunning or Operating Hours
- RKRoll-Metric Measure
- RLRoll
- RMReam
- RNReam-Metric Measure
- RORound
- RPPounds per Ream
- RSResets
- RTRevenue Ton Miles
- RURun
- S3Square Feet per Second
- S4Square Meters per Second
- S5Sixty-fourths of an Inch
- S6Sessions
- S7Storage Units
- S8Standard Advertising Units (SAUs)
- S9Slip Sheet
- SASandwich
- SBSquare Mile
- SCSquare Centimeter
- SDSolid Pounds
- SESection
- SFSquare Foot
- SGSegment
- SHSheet
- SISquare Inch
- SJSack
- SKSplit Tanktruck
- SLSleeve
- SMSquare Meter
- SNSquare Rod
- SOSpool
- SPShelf Package
- SQSquare
- SRStrip
- SSSheet-Metric Measure
- STSet
- SU
- SVSkid
- SWSkein
- SXShipment
- SYSquare Yard
- T0Telecommunications Lines in Service
- T1Thousand pounds gross
- T2Thousandths of an Inch
- T3Thousand Pieces
- T4Thousand Bags
- T5Thousand Casings
- T6Thousand Gallons
- T7Thousand Impressions
- T8Thousand Linear Inches
- T9Thousand Kilowatt Hours/Megawatt-Hour
- TATenth Cubic Foot
- TBTube
- TCTruckload
- TDTherms
- TETote
- TFTen Square Yards
- TGGross Ton
- THThousand
- TIThousand Square Inches
- TJThousand Sq. Centimeters
- TKTank
- TLThousand Feet (Linear)
- TMThousand Feet (Board)
- TNNet Ton (2,000 LB).
- TOTroy Ounce
- TPTen-pack
- TQThousand Feet
- TRTen Square Feet
- TSThousand Square Feet
- TTThousand Linear Meters
- TUThousand Linear Yards
- TVThousand Kilograms
- TWThousand Sheets
- TXTroy Pound
- TYTray
- TZThousand Cubic Feet
- U1Treatments
- U2Tablet
- U3Ten
- U5Two Hundred Fifty
- UATorr
- UBTelecommunications Lines in Service - Average
- UCTelecommunications Ports
- UDTenth Minutes
- UETenth Hours
- UFUsage per Telecommunications Line - Average
- UHTen Thousand Yards
- ULUnitless
- UMMillion Units
- UNUnit
- VAVolt-ampere per Kilogram
- VCFive Hundred
- VIVial
- VSVisit
- VT
- W2Wet Kilo
- W4
- WAWatts per Kilogram
- WBWet Pound
- WEWet Ton
- WGWine Gallon
- WHWheel
- WIWeight per Square Inch
- WKWeek
- WMWorking Months
- WPPennyweight
- WRWrap
- WT
- WU
- WWMilliliters of Water
- X1Chains (Land Survey)
- YDYard
- YL100 Lineal Yards
- YRYears
- YTTen Yards
- Z1Lift Van
- Z2Chest
- Z3Cask
- Z4Hogshead
- Z5Lug
- Z6Conference Points
- Z8Newspaper Agate Line
- ZPPage
- ZZMutually Defined
Code specifying the type of quantity.
Codes (326)- 10Cumulative Quantity - Rejected Material: Disposition Pending
- 11Split Quantity
- 12Ship Notice Quantity
- 13Collateral Requirements
- 14Quantity in Float
- 15Quantity in Hold Out
- 16Line Thread Quantity
- 17Quantity on Hand
- 18Previous Week Quantity
- 19Unverified Receipts
- 20Unusable Quantity
- 21Cumulative Quantity Shipped Short - Disposition Pending
- 22Cumulative Quantity Shipped Short - Disposition Challenged
- 23Cumulative Quantity Shipped Long - Disposition Pending
- 24Cumulative Quantity Shipped Long - Disposition Challenged
- 25OEM Inventory
- 26Total Inventory
- 27Committed Quantity
- 28Quantity Available for Return
- 29Projected Available Inventory
- 30Quote Quantity on Inventory
- 31Additional Demand Quantity
- 32Quantity Sold
- 33Quantity Available for Sale (stock quantity)
- 34Noncommitted Inventory on Shelf
- 35Inventory on Shelf + Work in Progress
- 36Distributor Inventory
- 37Work In Process
- 38Original Quantity
- 39Shipped Quantity
- 40Remaining Quantity
- 41Number of Batches
- 42Number of Checks
- 45Cumulative quantity on order
- 46Total transactions
- 47Primary Net Quantity
- 48Secondary Net Quantity
- 49Number of Signed Bills of Lading
- 50Number of Copies of Bill of Lading
- 51Number of Unsigned Bills of Lading
- 52Number of Originals
- 53Original payment item count.
- 54Bank reject item count.
- 55Net to pay item count.
- 56Minimum Contract Quantity
- 57Minimum Order Quantity
- 58Payment Cancellation Item Count
- 60Total Authorized Quantity
- 61Remaining Authorized Quantity
- 62Number of Days Covered by Inventory
- 63On Order Quantity
- 64Past Due Quantity
- 65Previous Month's Usage
- 66Minimum Fabrication Quantity
- 67Minimum Ship Quantity
- 68Maximum Number of Shipments Allowed
- 69Incremental Order Quantity
- 70Maximum Order Quantity
- 72Minimum Stock Level
- 73Maximum Stock Level
- 74Damaged Goods
- 75Receipts
- 76Returns
- 77Stock Transfers In
- 78Stock Transfers Out
- 79Billing Unit(s) Per Pricing Unit
- 80Pricing Unit(s) Per Billing Unit
- 81Prepaid Quantity Shipped
- 82Prepaid Quantity Not Shipped
- 83Submitted Quantity Sold
- 84Submitted Quantity Returned
- 85Lot Size
- 86Nonconformance Quantity
- 87Quantity Received
- 88Beds
- 89Operating Beds
- 90Acknowledged Quantity
- 91Additional Usage Quantity
- 92Allotted Usage Quantity
- 93Attendant-Handled Quantity
- 94Billable Quantity
- 95Data Storage Quantity
- 96Non-Billable Quantity
- 97Non-Urgent Delivery Quantity
- 98Overflow Quantity
- 99Quantity Used
- 01Discrete Quantity
- 02Cumulative Quantity
- 03Discreet Quantity - Rejected Material
- 04Discrete Quantity - Rejected Material: Disposition Replacement
- 05Discrete Quantity - Rejected Material: Disposition Credit
- 06Discrete Quantity - Rejected Material: Disposition Pending
- 07Cumulative Quantity - Rejected Material
- 08Cumulative Quantity - Rejected Material: Disposition Replacement
- 09Cumulative Quantity - Rejected Material: Disposition Credit
- 1AOriginal Duration (in calendar units)
- 1BCurrent Duration (in calendar units)
- 1CRemaining Duration (in calendar units)
- 1DTotal Float (in calendar units)
- 1EFree Float (in calendar units)
- 1FLag (as in Lag Time - in calendar units)
- 1GLead Time (in calendar units)
- 1HStarted
- 1ICompleted
- 1JDue
- 1KTime Units
- 1LShifts
- 1MTime units per shift
- 1NScrap allowed
- 1OCalendar Units
- 1PResource (Quantity) available
- 1QTotal Resource (Quantity)
- 1RLevel Resource (Quantity)
- 1SLate
- 1TNumber of Delinquent Installments
- 1UNumber of Loans
- 1VTotal Number of Mortgagees
- 1WTotal Number of Loan Detail Records
- 1XPrescription Effective Period
- A1Acceptable Unserviceable Quantity
- A2Optimistic Duration
- A3Most Likely Duration
- A4Pessimistic Duration
- A5Adjusted Quantity
- A6Accidents
- AAUnacknowledged Quantity
- ABUrgent Delivery Quantity
- ACVoice Storage Quantity
- ADMaintenance Units
- AEMinimum Average Time Requirement (MATR) Units
- AFWide Area Telephone Service (WATS)/800 Service Units
- AGNumber of End Users
- AHNumber of Message Recipients
- AINumber of Operator Credits
- AJDaily Adjustments
- AOVerified Receipts
- APOrder Quantity Multiple
- AQContribution Total
- ARLoan Repayment Total
- ASParticipant Total
- ATActual
- AUCumulative Actual
- AVBudget
- AWCumulative Budget
- AXNumber of Insured Lives
- AYForecast
- AZForecast at Complete
- BADue-In
- BCBudget At Complete
- BFAge Modifying Units
- BIBook Inventory
- BQBackorder Quantity
- BRBlood Record
- CACovered - Actual
- CBClosing Statement Balance
- CDCo-insured - Actual
- CECovered - Estimated
- CFCo-insured - Estimated
- CGCumulative Gas Volume
- CHCumulative Effect of Prior Period Adjustment
- CICumulative Gas Injection Volume
- CLCumulative Liquid Injection Volume
- COCumulative Oil/Condensate Volume
- CPCurrent Period Imbalance
- CRCertified Registered Nurse Anesthetist (CRNA) Number of Concurrent Procedures
- CSCurrent Service Life
- CWCumulative Water Volume
- D3Number of Co-insurance Days
- DBDeductible Blood Units
- DODays Operated
- DPDays Produced
- DRDirect Workers
- DTDependent Total
- DYDays
- E1Course Segments
- E2Degree Segments
- ECUse of Extracorporeal Circulation
- EMEmergency Modifying Units
- EPProduct Exchange Amount
- ETEmployee Total
- FBFurnished Blood Units
- FCFuel Consumed or Burned Amount
- FTForecast to Complete
- GIGas Injection Volume
- GLGas Lift Volume
- GTGrade Transfer Amount
- GVGas Volume
- HMUse of Hypothermia
- HOUse of Hypotension
- HPUse of Hyperbaric Pressurization
- HRUse of Hypertension
- HSHours
- IINumber of Irregular Interest Payments
- INIndirect Workers
- IPNumber of Interest Payments
- IQIn-Transit Quantity
- ITIntertank Transfer Amount
- K6Drafts
- KAEstimated
- KBNet Quantity Increase
- KCNet Quantity Decrease
- KDExpenditure Quantity
- KEOriginals
- KFDuplicates
- LALife-time Reserve - Actual
- LBLoss Allowance
- LELife-time Reserve - Estimated
- LGLoss or Gain
- LILiquid Injection Volume
- LPLease Periods
- LTTariff Loss Allowance
- LVOil/Condensate Volume
- MAMiscellaneous Allowance
- MIMiles
- MNMonth
- MQMaximum Ship Quantity
- NANumber of Non-covered Days
- NCNumber of Claimants
- NENon-Covered - Estimated
- NNNumber of Hospitals
- NONumber of Physicians
- NPNumber of Members
- NQNumber of Franchisees
- NRNot Replaced Blood Units
- NSNumber of Stations
- OIOpening Statement Balance
- OROriginal
- OTNumber of Operating Periods at Failure
- P3Physical Status III
- P4Physical Status IV
- P5Physical Status V
- P6Number of Services or Procedures
- PAPipeline Adjustment or Allowance
- PBPressure Base
- PCPrior Cumulative Imbalance
- POPercentage of Ordered Quantity
- PPPurchase of Product
- PQCumulative Quantity Required Prior to the First Scheduled Period
- PRRequirement Quantity that was Previously Released
- PSPrescription
- PXPrior Units Accepted
- QAQuantity Approved
- QBQuantity Dispensed
- QCQuantity Disapproved
- QDQuantity Delivered
- QEQuantity Deferred
- QFHigh Fabrication Authorization Quantity
- QHQuantity on Hold
- QPQuantity by Position
- QRHigh Raw Material Authorization Quantity
- QSQuantity Per Skid
- QUQuantity Serviced
- RARefills Authorized
- RBReplaced Blood Units
- SGSwan-Ganz
- SPDays Supply
- SQProduct Sales Amount
- STStandard
- TATank Allowance
- TCTotal at Complete
- TDTotal to Date
- TENumber of Theatres
- TOTotal
- TRTrips
- V1Retention Quantity
- V2Available Quantity
- V3Transfer Quantity
- VAVolume Shrinkage Adjustment or Allowance
- VRVariance
- VSVisits
- WVWater Volume
- XATotal of Issuable Assets
- XBTotal System Backorder Quantity, High Priority
- XCTotal Service Backorder Quantity, High Priority
- XDTotal System Backorder Quantity, Low Priority
- XETotal Service Backorder Quantity, Low Priority
- XGOn Hand and Due-In
- XJOther War Reserve Material Requirements Protectable (OWRMRP) Quantity
- XTProtected Quantity
- XUReserved
- XVRequisitioning Objective
- XXAuthorized Retention Level
- XYSafety Level
- XZBackorder Lines
- YATotal Demand Quantity
- YBTotal Demand Orders
- YCFirst Quarter Recurring Demand
- YDFirst Quarter Recurring Orders
- YEFirst Quarter Non-recurring Demand
- YFFirst Quarter Non-recurring Orders
- YGSecond Quarter Recurring Demand
- YHSecond Quarter Recurring Orders
- YJSecond Quarter Non-recurring Demand
- YKSecond Quarter Non-recurring Orders
- YLThird Quarter Recurring Demand
- YMThird Quarter Recurring Orders
- YNThird Quarter Non-recurring Demand
- YPThird Quarter Non-recurring Orders
- YQFourth Quarter Recurring Demand
- YRFourth Quarter Recurring Orders
- YSFourth Quarter Non-recurring Demand
- YTFourth Quarter Non-recurring Orders
- YWReorder Point Quantity
- YXContract Line Item Quantity
- YYYears
- Z1Units Worked Last Day
- Z2Units Worked per Week
- Z3Units Worked per Quarter
- Z4Number Weeks Paid
- Z6Unused Accumulated Sick Days
- ZAFederal Medicare or Medicaid Claim Mandate - Category 1
- ZBFederal Medicare or Medicaid Claim Mandate - Category 2
- ZCFederal Medicare or Medicaid Claim Mandate - Category 3
- ZDFederal Medicare or Medicaid Claim Mandate - Category 4
- ZEFederal Medicare or Medicaid Claim Mandate - Category 5
- ZFFederal Pension Mandate - Category 1
- ZGFederal Pension Mandate - Category 2
- ZHFederal Pension Mandate - Category 3
- ZIHolding Period
- ZJFederal Pension Mandate - Category 5
- ZKFederal Medicare or Medicaid Payment Mandate - Category 1
- ZLFederal Medicare or Medicaid Payment Mandate - Category 2
- ZMFederal Medicare or Medicaid Payment Mandate - Category 3
- ZNFederal Medicare or Medicaid Payment Mandate - Category 4
- ZOFederal Medicare or Medicaid Payment Mandate - Category 5
- ZPFederal Pension Mandate - Category 4
Code to qualify amount
Codes (432)- 1Line Item Total
- 2Batch Total
- 3Deposit Total
- 4Lock Box Total
- 5Total Invoice Amount
- 6Amount Subject to Total Monetary Discount
- 7Discount Amount Due
- 8Total Monetary Discount Amount
- 9Total Operational Statement Amount
- 10Shipment Value in U.S. Dollars
- 11Liabilities at Bankruptcy
- 12Account Average Balance Account
- 13Outstanding Balance at Foreclosure
- 14Legal Obligation Debt Amount
- 15Estimated Closing Cost Amount
- 16Discount Fees Paid by Borrower Amount
- 17Closing Costs or Concessions Paid by Seller
- 18Prepaid Items Amount
- 19Federal Housing Administration, Mortgage Insurance Premium Funding Fee Financed Amount
- 20Federal Housing Administration, Mortgage Insurance Premium or Veteran's Administration Funding Fee Amount
- 21Original Cost of Property Amount
- 22Owner's Estimate of Value Amount
- 23Appraised Value Amount
- 24Gross Monthly Income Amount
- 25Assets at Bankruptcy
- 26Negotiated Cost
- 27Authorized Unpriced Work
- 28Target Price
- 29Estimated Price
- 30Contract Ceiling
- 31Estimated Contract Ceiling
- 32Target Fee or Profit Amount
- 33Original Contract Target Cost
- 34Negotiated Contract Changes
- 35Current Target Cost
- 36Contract Budget Base (CBB)
- 37Current Budgeted Cost for Work Scheduled (BCWS)
- 38Current Budgeted Cost for Work Performed (BCWP)
- 39Current Actual Cost of Work Performed (ACWP)
- 40Current Schedule Variance (SV)
- 41Current Cost Variance (CV)
- 42Cumulative Budgeted Cost for Work Scheduled (BCWS)
- 43Cumulative Budgeted Cost for Work Performed (BCWP)
- 44Cumulative Actual Cost of Work Performed (ACWP)
- 45Cumulative Schedule Variance (SV)
- 46Cumulative Cost Variance (CV)
- 47Reprogram Cost Variance
- 48Reprogram Budget
- 49At Complete Budget (BAC)
- 50At Complete Latest Revised Estimate (LRE)
- 51At Complete Variance
- 52Total Allocated Budget
- 53Difference (Contract Budget Base - Total Allocated Budget)
- 54Forecast
- 55At Complete Forecast
- 56Current Cost Performance Index (CPIe) - Efficiency (BCWP/ACWP)
- 57Current Cost Performance Index (CPIp) - Planned (ACWP/BCWP)
- 58Current Schedule Performance Index (SPI)
- 59Cumulative Cost Performance Index (CPIe) - Efficiency (BCWP/ACWP)
- 60Cumulative Cost Performance Index (CPIp) - Planned (ACWP/BCWP)
- 61Cumulative Schedule Performance Index (SPI)
- 62To Complete Performance Index (TCPI) for Budget at Complete (BAC)
- 63To Complete Performance Index (TCPI) for Estimate At Complete (EAC)
- 64Initial Contract Price Target
- 65Initial Contract Price Ceiling
- 66Adjusted Contract Price Target
- 67Adjusted Contract Price Ceiling
- 68Funds Authorized to Date
- 69Accrued Expenditures
- 70Open Commitments
- 71Forecast of Billings
- 72Estimated Termination Costs
- 73Accrued Expenditures plus Open Commitments
- 74Contract Work Authorized - Definitized
- 75Contract Work Authorized - Not Definitized
- 76Contract Work Authorized - Total
- 77Forecast of Work - Not Yet Authorized
- 78Forecast of Work - All Other
- 79Forecast of Work - Total
- 80Funding - Total Requirements
- 81Funds Carryover
- 82Net Funds Required
- 83Contract Work Authorized (with fee/profit) Actual or Projected
- 84Contract Work Authorized (with fee/profit) Actual or Projected - At Complete
- 85Best Case Estimate
- 86Worst Case Estimate
- 87Most Likely Estimate
- 88"As Is" Appraisal Amount
- 89"Subject To" Appraisal Amount
- 90"Completion Per Plans" Appraisal Amount
- 91Site Value Amount
- 92Compensation
- 93Contribution
- 94Death Benefit
- 95Death Benefit Decrement
- 96Employee Account Balance
- 97Loan Repayment
- 98Prior W2
- 99Single Premium
- AAdjusted Chargeback Claim Amount
- BEstimated
- CCity
- DPayor Amount Paid
- EEstimated Credit
- FAnnual Limit
- HBid Amount
- IInterest
- JTrustee Fees
- KAttorney and Trustee Fees
- LLocal
- MAmount Due from Buyer at Appraisal Notice Date
- NNet
- PPenalty
- QAmount Owed to Buyer at Appraisal Notice Date
- SSubmitted Chargeback Claim Amount
- TTax
- WDeficiency Judgment Fees
- XDeficiency Judgment Expenses and Fees
- A1Average Negative Ledger Balance
- A2Average Positive Collected Balance
- A3Average Negative Collected Balance
- A4Average Positive Ledger Balance
- A5Disallowed - Estimated
- A6Disallowed - Actual
- A7Noncovered Charges - Estimated
- A8Noncovered Charges - Actual
- A9Allowed - Estimated
- ABAdjusted Collected Balance
- ACAverage Collected Balance
- ADAdjusted Total
- AFAverage Float
- AGAdjusted Gross Income
- AHLoan Balance Difference
- AISale Amount
- AJFunds Held by Mortgagee
- AKAttorney Fees
- ALAverage Ledger Balance
- AMAmount Financed
- ANBankruptcy Fee
- AOAmount Override
- APAmount Prior to Fractionalization
- AQAverage Price Per Call
- ARFees to Public Officials for Foreclosure
- ASAverage Price Per Minute
- ATTotal Received
- AUCoverage Amount
- AVActual Cash Value
- AWReplacement Cost
- AXPrevious Price
- AYTitle Cost
- AZOther Foreclosure and Acquisition Expenses
- B1Benefit Amount
- B2Bonuses and Commissions Divided Over 12 Months
- B3Bonuses Divided Over 12 Months
- B4Bonuses and Commissions
- B5Budgeted
- B6Allowed - Actual
- B7Deductible - Estimated
- B8Co-insurance - Estimated
- B9Co-insurance - Actual
- BABargain
- BBMortgage Insurance Premiums
- BCBilling Cycle Net Fee Position (Excess/Deficit)
- BDBalance Due
- BEDisbursements for Authorized Repair
- BFHazard Insurance Premium
- BGEviction Attorney Fees
- BHEviction Expenses
- BIProperty Taxes
- BJDisbursements Not Shown Elsewhere
- BKDisbursements for Protection and Preservation
- BLDisbursements for Inspections and Boarding
- BMAdjustments
- BNRental Income
- BORental Expense
- BRAdjusted Insured Loss Amount
- BSMortgage Note Interest
- BTBank Reject Total
- BUOverhead Costs
- BVUncollected Interest
- BWAmount Due from Buyer at Closing
- BXAmount Owed to Buyer at Closing
- BYAdditional Closing Expenses
- BZDeficiency Judgment Expenses
- C1Co-Payment Amount
- C2Child Rider Coverage
- C3Prior Payment - Estimated
- C4Prior Payment - Actual
- C5Claim Amount Due - Estimated
- C6Claim Amount Due - Actual
- C7Payor Responsibility - Estimated
- C8Payor Responsibility - Actual
- C9Disallowed Cost Containment - Actual
- CBCollected Balance Required
- CCChargeback Claim Amount
- CDOverpaid Section 235 Subsidy
- CESummary Amount
- CFAppraisal Fees
- CGCommission Fees Deducted
- CHChange Amount
- CIFunds Held for Insured
- CJOther Deductions
- CKBack End Load
- CLOutstanding Balance Current Lender
- CMClaimant Requested Total
- CNSpecial Assessments
- COTaxes on Deed
- CPStatutory Disbursements
- CQNet Claim Amount
- CSCommission Sales
- CTContract
- D1Deferred Compensation Commissions
- D2Deductible Amount
- D3Deferred Compensation Commissions and Bonuses
- D4Deferred Compensation
- D5Dependent Care Contribution
- D6Disallowed Cost Containment - Estimated
- D7Dispensing Fee
- D8Discount Amount
- DAOriginal Mortgage
- DBUnapplied Section 235 Funds
- DCUnapplied Buydown Fund
- DDDirect Deposit
- DEEstimate of Damage
- DFAuthorized Bid
- DGEscrow Balance
- DHTotal Disbursements
- DYPer Day Limit
- E1Employer Year to Date Contribution
- E2Employee Annual Pledge Amount
- E3Employee Current Contribution
- E4Employer Pledge Amount
- E5Employer Current Contribution
- E6Eligible Wage Amount
- E7Employee Year to Date Contribution
- E8Education Contribution
- E9Initial Fee
- EAEarnings Allowance
- EBCollected Balance (Excess/Deficit)
- ECAllowance (Excess/Deficit)
- EDEstimated Cost of Attendance
- EFEstimated Financial Aid
- EPEmployer Annual Pledge Amount
- F1Maximum Allowable Cost (MAC) Penalty Copay
- F2Patient Responsibility - Actual
- F3Patient Responsibility - Estimated
- F4Postage Claimed
- F5Patient Amount Paid
- F6Provider Reserves
- F7Sales Tax
- F8Usual and Customary Charge - Estimated
- F9Usual and Customary - Actual
- FCExpected Family Contribution
- FDDirect Deposit Flipped to Check
- FIFirst Interest Payment Amount
- FLFloat
- FMFair Market Value
- FOFees Paid
- FPFees Paid Year to Date
- I1Investment Income
- IBInvestable Balance
- ICAccrued Unpaid Interest To Be Capitalized
- IIIrregular Interest Payment Amount
- IPInterest Payable During Repayment Period
- IRInsurance Recovery
- IUAccrued Unpaid Interest Not To Be Capitalized
- KAEstimated Contract
- KBEstimated Net Adjustment
- KCObligated
- KDUndefinitized
- KEAnnual Revenue
- KFNet Paid Amount
- KGNet Collected Amount
- KHDeduction Amount
- KINet Variance Amount
- KJMinimum Contract Amount
- KKItem Gross Amount
- KLCollected Amount
- KMDisbursed Amount
- KNGross Amount of Payment
- KOCommitted Amount
- KPPrincipal and Interest
- KQIncremental Order Amount
- KSTaxes and Insurance
- KTDefault Principal
- KUDefault Interest
- KWDefault Taxes and Insurance
- KXMiscellaneous Fee Collections
- KZMortgagor's Monthly Obligations
- L1Legal Contribution
- LCLessor's Cost
- LELoan Eligibility Amount
- LILine Item Unit Price
- LMLimit
- LNLien Payoff
- LPList Price
- LWTax and Insurance Escrow Fund Balance
- LXLoan Expense
- LYTotal Remaining Principal Balance for the Issuer
- LZDelinquent Payment
- M1Maximum Out of Pocket Amount
- M2Medical Contribution
- MAMaximum Amount
- MBUndistributed Budget
- MCCost of Money
- MNMonthly Limit
- MOMinimum Order Value
- MPMonthly Payment Amount
- MRManagement Reserve
- MSPast-Due Taxes and Assessment Remaining Unpaid
- N1Net Worth
- NANet Adjustment
- NBNet Compensation Position
- NCNegative Collected Balance
- NDPer Person Monthly Limit
- NFMonthly Net Fee Position (Excess/Deficit)
- NLNegative Ledger Balance
- NONon Commission Sales
- NPNet to Pay Total
- NQAdjusted Nonrecurring
- NRNonrecurring
- NSNet Savings Amount
- NYNet Year to Date (Excess/Deficit)
- OBOutstanding Loan Balance
- OLOutstanding Balance Other Lender
- OPOriginal Payment Total
- P1Partner's Calendar Year Salary
- P2Prior Plan Year Gross Salary
- P3Premium Amount
- P4Prior Year's Wage
- P5Partner's Tax Year Salary
- P6Premium Due
- P7Partner's K1 Tax Year Amount
- P8Partner's K1 Calendar Year Amount
- P9Current Mortgage Principal Balance
- PAPayment Cancellation Total
- PBBilled Amount
- PCPositive Collected Balance
- PEPlan Period Election
- PFPrincipal
- PGPayoff
- PHPer Occurrence Deductible
- PIPer Occurrence Monthly Limit
- PLPositive Ledger Balance
- PMLast Premium Amount
- PNPrior Gross Invoice Total
- POPercent Override
- PPPayment Prior to Advance
- PQAdvance Amount
- PRPer Occurrence Limit
- PSPer Occurrence per Day Limit
- PTPer Occurrence Aggregate Limit
- PWPer Occurrence Maximum per Week Limit
- PXPer Person Maximum per Week Limit
- PYPer Person per Day Limit
- PZOriginal Principal Balance
- Q1Proposed
- QNQuarterly Net Fee Position (Excess/Deficit)
- RBPer Person Deductible
- RCRefund Check
- RDPer Person Limit
- RHPer Person Aggregate Limit
- RPRepair
- RRReserve Requirement Amount
- RSReserves
- RTLast Payment
- RWTotal Delinquency
- RZLender's Total Delinquency
- S1Salary Amount
- S2Salary with Bonuses
- S3Salary with Commissions
- S4Salary with Subchapter S Corporation Income
- S5Salary with Partner's Bonuses
- S6Subchapter S Corporation
- S7Sole Proprietorship
- SACampaign Summary Amount
- SBStated Amount
- SCTotal Service Charge
- SEService Charges Which Cannot Be Compensated by Balances
- SISubsequent Interest Payment Amount
- SMSupplemental
- SSCampaign Summary Amount to be Shared
- STState
- T1Teacher
- T2Total Claim Before Taxes
- T3Total Submitted Charges
- TATotal Annual Sales
- TBTotal Annual Sales to Customer
- TCProposed Cost
- TDProposed Profit
- TEProposed Fee
- TFTotal Proposed Price
- TGAlternate Proposed Price
- TLTotal Prior Loan Amount Owed
- TMTime and Expense Paid Current Month
- TPTotal payment amount
- TSTotal Sales
- TTTotal Transaction Amount
- TXTotal to Date
- TYTotal at Complete
- U2Ingredient Cost Claimed
- UAUnliquidated Amount
- UBUnpaid Principal Balance
- UCUnspecified Aggregate Limit
- UGTotal Unpaid Principal Balance for Stafford Loans
- UPTotal Unpaid Principal Balance for Parental Loans for Students
- USTotal Unpaid Principal Balance for Supplemental Loans for Students
- W1W-2
- W2W-2 with Bonuses
- W3W-2 with Deferred Compensation
- W4W-2 without Bonuses
- WKPer Week Limit
- Y1Year to Date Eligible Salary
- Z1Repackaging Labor Cost
- Z2Repackaging Material Cost
- Z3Unit Cost of Discrepant Material
- ZAFederal Medicare or Medicaid Claim Mandate - Category 1
- ZBFederal Medicare or Medicaid Claim Mandate - Category 2
- ZCFederal Medicare or Medicaid Claim Mandate - Category 3
- ZDFederal Medicare or Medicaid Claim Mandate - Category 4
- ZEFederal Medicare or Medicaid Claim Mandate - Category 5
- ZFFederal Pension Mandate - Category 1
- ZGFederal Pension Mandate - Category 2
- ZHFederal Pension Mandate - Category 3
- ZIFederal Pension Mandate - Category 4
- ZJFederal Pension Mandate - Category 5
- ZKFederal Medicare or Medicaid Payment Mandate - Category 1
- ZLFederal Medicare or Medicaid Payment Mandate - Category 2
- ZMFederal Medicare or Medicaid Payment Mandate - Category 3
- ZNFederal Medicare or Medicaid Payment Mandate - Category 4
- ZOFederal Medicare or Medicaid Payment Mandate - Category 5
- ZZMutually Defined
Code specifying the units in which a value is being expressed, or manner in which a measurement has been taken
Codes (719)- 10Group
- 11Outfit
- 12Packet
- 13Ration
- 14Shot
- 15Stick
- 16115 Kilogram Drum
- 17100 Pound Drum
- 1855 Gallon Drum
- 19Tank Truck
- 2020 Foot Container
- 2140 Foot Container
- 22Deciliter per Gram
- 23Grams per Cubic Centimeter
- 24Theoretical Pounds
- 25Grams per Square Centimeter
- 26Actual Tons
- 27Theoretical Tons
- 28Kilograms per Square Meter
- 29Pounds per 1000 Square Feet
- 30Horsepower Days per Air Dry Metric Tons
- 31Catchweight
- 32Kilograms per Air Dry Metric Tons
- 33Kilopascal Square Meters per Gram
- 34Kilopascals per Millimeter
- 35Milliliters per Square Centimeter Second
- 36Cubic Feet per Minute per Square Foot
- 37Ounces per Square Foot
- 38Ounces per Square Foot per 0.01 Inch
- 40Milliliter per Second
- 41Milliliter per Minute
- 43Super Bulk Bag
- 44500 Kilogram Bulk Bag
- 45300 Kilogram Bulk Bag
- 4625 Kilogram Bulk Bag
- 4750 Pound Bag
- 48Bulk Car Load
- 50Actual Kilograms
- 51Actual Tonnes
- 53Theoretical Kilograms
- 54Theoretical Tonnes
- 56Sitas
- 57Mesh
- 58Net Kilograms
- 59Parts Per Million
- 60Percent Weight
- 61Parts Per Billion
- 62Percent Per 1000 Hours
- 63Failure Rate In Time
- 64Pounds Per Square Inch Gauge
- 65Coulomb
- 66Oersteds
- 67Siemens
- 68Ampere
- 69Test Specific Scale
- 70Volt
- 71Volt-Ampere Per Pound
- 72Watts Per Pound
- 73Ampere Turn Per Centimeter
- 74Milli Pascals
- 76Gauss
- 77Mil
- 78Kilogauss
- 79Electron Volt
- 80Pounds Per Square Inch Absolute
- 81Henry
- 82Ohm
- 83Farad
- 84Kilo Pounds Per Square Inch (KSI)
- 85Foot Pounds
- 86Joules
- 87Pounds per Cubic Foot
- 89Poise
- 90Saybold Universal Second
- 91Stokes
- 92Calories per Cubic Centimeter
- 93Calories per Gram
- 94Curl Units
- 9520,000 Gallon Tankcar
- 9610,000 Gallon Tankcar
- 9710 Kilogram Drum
- 9815 Kilogram Drum
- 01Actual Pounds
- 02Statute Mile
- 03Seconds
- 04Small Spray
- 05Lifts
- 08Heat Lots
- 1ACar Mile
- 1BCar Count
- 1CLocomotive Count
- 1DCaboose Count
- 1EEmpty Car
- 1FTrain Mile
- 1GFuel Usage (Gallons)
- 1HCaboose Mile
- 1IFixed Rate
- 1JTon Miles
- 1KLocomotive Mile
- 1LTotal Car Count
- 1MTotal Car Mile
- 1XQuarter Mile
- 2ARadians Per Second
- 2BRadians Per Second Squared
- 2CRoentgen
- 2FVolts Per Meter
- 2GVolts (Alternating Current)
- 2HVolts (Direct Current)
- 2IBritish Thermal Units (BTUs) Per Hour
- 2JCubic Centimeters Per Second
- 2KCubic Feet Per Hour
- 2LCubic Feet Per Minute
- 2MCentimeters Per Second
- 2NDecibels
- 2PKilobyte
- 2QKilobecquerel
- 2RKilocurie
- 2UMegagram
- 2VMegagrams Per Hour
- 2WBin
- 2XMeters Per Minute
- 2YMilliroentgen
- 2ZMillivolts
- 3ADegrees Lovibond
- 3BMegajoule
- 3CManmonth
- 3EPounds Per Pound of Product
- 3FKilograms Per Liter of Product
- 3GPounds Per Piece of Product
- 3HKilograms Per Kilogram of Product
- 3IKilograms Per Piece of Product
- 4ABobbin
- 4BCap
- 4CCentistokes
- 4DCurie
- 4E20-Pack
- 4F100-Pack
- 4GMicroliter
- 4H
- 4IMeters Per Second
- 4JMeters Per Second Per Second
- 4KMilliamperes
- 4LMegabyte
- 4MMilligrams Per Hour
- 4NMegabecquerel
- 4OMicrofarad
- 4PNewtons Per Meter
- 4QOunce Inch
- 4ROunce Foot
- 4SPascal
- 4TPicofarad
- 4UPounds Per Hour
- 4VCubic Meter Per Hour
- 4WTon Per Hour
- 4XKiloliter Per Hour
- 5ABarrels per Minute
- 5BBatch
- 5CGallons per Thousand
- 5EMMSCF/Day
- 5FPounds per Thousand
- 5GPump
- 5HStage
- 5IStandard Cubic Foot
- 5JHydraulic Horse Power
- 5KCount per Minute
- 5PSeismic Level
- 5QSeismic Line
- A8Dollars per Hours
- A9Millipoises
- AABall
- ABBulk Pack
- ACAcre
- ADBytes
- AEAmperes per Meter
- AFCentigram
- AHAdditional Minutes
- AIAverage Minutes Per Call
- AJCop
- AKFathom
- ALAccess Lines
- AMAmpoule
- ANMinutes or Messages
- APAluminum Pounds Only
- AQAnti-hemophilic Factor (AHF) Units
- ARSuppository
- ASAssortment
- ATAtmosphere
- AUOcular Insert System
- AVCapsule
- AWPowder-Filled Vials
- AXTwenty
- AYAssembly
- AZBritish Thermal Units (BTUs) per Pound
- B0British Thermal Units (BTUs) per Cubic Foot
- B1Barrels per Day
- B2Bunks
- B3Batting Pound
- B4Barrel, Imperial
- B5Billet
- B6Bun
- B7Cycles
- B8Board
- B9Batt
- BABale
- BBBase Box
- BCBucket
- BDBundle
- BEBeam
- BFBoard Feet
- BGBag
- BHBrush
- BIBar
- BJBand
- BKBook
- BLBlock
- BMBolt
- BNBulk
- BOBottle
- BP100 Board Feet
- BQBrake horse power
- BRBarrel
- BSBasket
- BTBelt
- BUBushel
- BVBushel, Dry Imperial
- BWBase Weight
- BXBox
- BYBritish Thermal Unit (BTU)
- BZMillion BTUs/Dekatherm
- C0Calls
- C1Composite Product Pounds (Total Weight)
- C2Carset
- C3Centiliter
- C4Carload
- C5Cost
- C6Cell
- C7Centipoise (CPS)
- C8Cubic Decimeter
- C9Coil Group
- CACase
- CBCarboy
- CCCubic Centimeter
- CDCarat
- CECentigrade, Celsius
- CFCubic Feet
- CGCard
- CHContainer
- CICubic Inches
- CJCone
- CKConnector
- CLCylinder
- CMCentimeter
- CNCan
- COCubic Meters (Net)
- CPCrate
- CQCartridge
- CRCubic Meter
- CSCassette
- CTCarton
- CUCup
- CVCover
- CWHundred Pounds (CWT)
- CXCoil
- CYCubic Yard
- CZCombo
- D3Square Decimeter
- D5Kilogram Per Square Centimeter
- D8Draize Score
- D9Dyne per Square Centimeter
- DADays
- DBDry Pounds
- DCDisk (Disc)
- DDDegree
- DEDeal
- DFDram
- DGDecigram
- DHMiles
- DIDispenser
- DJDecagram
- DKKilometers
- DLDeciliter
- DMDecimeter
- DNDeci Newton-Meter
- DODollars, U.S.
- DPDozen Pair
- DQData Records
- DRDrum
- DSDisplay
- DTDry Ton
- DUDyne
- DXDynes per Centimeter
- DYDirectory Books
- DZDozen
- E1Hectometer
- E3Inches, Fraction-Average
- E4Inches, Fraction-Minimum
- E5Inches, Fraction-Actual
- E7Inches, Decimal-Average
- E8Inches, Decimal-Actual
- E9English, (Feet, Inches)
- EAEach
- EBElectronic Mail Boxes
- ECEach per Month
- EDInches, Decimal-Nominal
- EFInches, Fraction-Nominal
- EMInches, Decimal-Minimum
- EPEleven pack
- EQEquivalent Gallons
- EVEnvelope
- EXFeet, Inches and Fraction
- EYFeet, Inches and Decimal
- EZFeet and Decimal
- F1Thousand Cubic Feet Per Day
- F9Fibers per Cubic Centimeter of Air
- FAFahrenheit
- FBFields
- FCBlister Pak
- FDMillion Particles per Cubic Foot
- FETrack Foot
- FFHundred Cubic Meters
- FGTransdermal Patch
- FHMicromolar
- FLFlake Ton
- FMMillion Cubic Feet
- FOFluid Ounce
- FPPounds per Sq. Ft.
- FRFeet Per Minute
- FSFeet Per Second
- FTFoot
- FZFluid Ounce (Imperial)
- G2U.S. Gallons Per Minute
- G3Imperial Gallons Per Minute
- G4Gigabecquerel
- G5Gill (Imperial)
- G7Microfiche Sheet
- GAGallon
- GBGallons/Day
- GCGrams per 100 Grams
- GDGross Barrels
- GEPounds per Gallon
- GFGrams per 100 Centimeters
- GGGreat Gross (Dozen Gross)
- GHHalf Gallon
- GIImperial Gallons
- GJGrams per Milliliter
- GKGrams per Kilogram
- GLGrams per Liter
- GMGrams per Sq. Meter
- GNGross Gallons
- GOMilligrams per Square Meter
- GPMilligrams per Cubic Meter
- GQMicrograms per Cubic Meter
- GRGram
- GSGross
- GTGross Kilogram
- GVGigajoules
- GWGallons Per Thousand Cubic Feet
- GXGrain
- GYGross Yard
- GZGage Systems
- H1Half Pages - Electronic
- H2Half Liter
- H4Hectoliter
- HAHank
- HBHundred Boxes
- HCHundred Count
- HDHalf Dozen
- HEHundredth of a Carat
- HFHundred Feet
- HGHectogram
- HHHundred Cubic Feet
- HIHundred Sheets
- HJHorsepower
- HKHundred Kilograms
- HLHundred Feet - Linear
- HMMiles Per Hour
- HNMillimeters of Mercury
- HOHundred Troy Ounces
- HPMillimeter H20
- HRHours
- HSHundred Square Feet
- HTHalf Hour
- HUHundred
- HVHundred Weight (Short)
- HWHundred Weight (Long)
- HYHundred Yards
- HZHertz
- IAInch Pound
- IBInches Per Second (Vibration Velocity)
- ICCounts per Inch
- IEPerson
- IFInches of Water
- IIColumn-Inches
- ILInches per Minute
- IMImpressions
- INInch
- IPInsurance Policy
- ITCounts per Centimeter
- IUInches Per Second (Linear Speed)
- IVInches Per Second Per Second (Acceleration)
- IWInches Per Second Per Second (Vibration Acceleration)
- J2Joule Per Kilogram
- JBJumbo
- JEJoule Per Kelvin
- JGJoule per Gram
- JKMega Joule per Kilogram
- JMMegajoule/Cubic Meter
- JOJoint
- JRJar
- JUJug
- K1Kilowatt Demand
- K2Kilovolt Amperes Reactive Demand
- K3Kilovolt Amperes Reactive Hour
- K4Kilovolt Amperes
- K5Kilovolt Amperes Reactive
- K6Kiloliter
- K7Kilowatt
- KACake
- KBKilocharacters
- KCKilograms per Cubic Meter
- KDKilograms Decimal
- KEKeg
- KFKilopackets
- KGKilogram
- KHKilowatt Hour
- KIKilograms/Millimeter Width
- KJKilosegments
- KK100 Kilograms
- KLKilograms/Meter
- KMKilograms per Square Meter, Kilograms, Decimal
- KOMillequivalence Caustic Potash per Gram of Product
- KPKilometers Per Hour
- KQKilopascal
- KRKiloroentgen
- KS
- KTKit
- KVKelvin
- KWKilograms per Millimeter
- KXMilliliters per Kilogram
- L2Liters Per Minute
- LAPounds Per Cubic Inch
- LBPound
- LCLinear Centimeter
- LD
- LELite
- LFLinear Foot
- LGLong Ton
- LHLabor Hours
- LILinear Inch
- LJLarge Spray
- LKLink
- LMLinear Meter
- LNLength
- LOLot
- LPLiquid Pounds
- LQLiters Per Day
- LRLayer(s)
- LSLump Sum
- LTLiter
- LXLinear Yards Per Pound
- LYLinear Yard
- M0Magnetic Tapes
- M1Milligrams per Liter
- M2Millimeter-Actual
- M3Mat
- M4Monetary Value
- M5Microcurie
- M6Millibar
- M7Micro Inch
- M8Mega Pascals
- M9Million British Thermal Units per One Thousand Cubic Feet
- MAMachine/Unit
- MBMillimeter-Nominal
- MCMicrogram
- MDAir Dry Metric Ton
- MEMilligram
- MFMilligram per Sq. Ft. per Side
- MGMetric Gross Ton
- MHMicrons (Micrometers)
- MIMetric
- MJMinutes
- MKMilligrams Per Square Inch
- MLMilliliter
- MMMillimeter
- MNMetric Net Ton
- MOMonths
- MPMetric Ton
- MQ1000 Meters
- MRMeter
- MSSquare Millimeter
- MTMetric Long Ton
- MUMillicurie
- MVNumber of Mults
- MWMetric Ton Kilograms
- MXMixed
- MYMillimeter-Average
- MZMillimeter-minimum
- N1Pen Calories
- N2Number of Lines
- N3Print Point
- N4Pen Grams (Protein)
- N6Megahertz
- NAMilligrams per Kilogram
- NBBarge
- NCCar
- NDNet Barrels
- NENet Liters
- NFMessages
- NGNet Gallons
- NHMessage Hours
- NINet Imperial Gallons
- NJNumber of Screens
- NLLoad
- NMNautical Mile
- NNTrain
- NQMho
- NRMicro Mho
- NSShort Ton
- NTTrailer
- NUNewton-Meter
- NVVehicle
- NWNewton
- NXParts Per Thousand
- NYPounds Per Air-Dry Metric Ton
- OAPanel
- ONOunces per Square Yard
- OPTwo pack
- OTOvertime Hours
- OZOunce - Av
- P0Pages - Electronic
- P1Percent
- P2Pounds per Foot
- P3Three pack
- P4Four-pack
- P5Five-pack
- P6Six pack
- P7Seven pack
- P8Eight-pack
- P9Nine pack
- PAPail
- PBPair Inches
- PCPiece
- PDPad
- PEPounds Equivalent
- PFPallet (Lift)
- PGPounds Gross
- PHPack (PAK)
- PIPitch
- PJPounds, Decimal - Pounds per Square Foot - Pound Gage
- PKPackage
- PLPallet/Unit Load
- PMPounds-Percentage
- PNPounds Net
- POPounds per Inch of Length
- PPPlate
- PQPages per Inch
- PRPair
- PSPounds per Sq. Inch
- PTPint
- PUMass Pounds
- PVHalf Pint
- PWPounds per Inch of Width
- PXPint, Imperial
- PYPeck, Dry U.S.
- PZPeck, Dry Imperial
- Q1Quarter (Time)
- Q2Pint U.S. Dry
- Q3Meal
- Q4Fifty
- Q5Twenty-Five
- Q6Thirty-Six
- Q7Twenty-Four
- QAPages - Facsimile
- QBPages - Hardcopy
- QDQuarter Dozen
- QHQuarter Hours
- QKQuarter Kilogram
- QRQuire
- QSQuart, Dry U.S.
- QTQuart
- QUQuart, Imperial
- R1Pica
- R2Becquerel
- R3Revolutions Per Minute
- R4Calorie
- R5Thousands of Dollars
- R6Millions of Dollars
- R7Billions of Dollars
- R9Thousand Cubic Meters
- RARack
- RDRod (length) - 5.5 Yards
- REReel
- RGRing
- RHRunning or Operating Hours
- RKRoll-Metric Measure
- RLRoll
- RMReam
- RNReam-Metric Measure
- RORound
- RPPounds per Ream
- RSResets
- RTRevenue Ton Miles
- RURun
- S3Square Feet per Second
- S4Square Meters per Second
- S5Sixty-fourths of an Inch
- S6Sessions
- S7Storage Units
- S8Standard Advertising Units (SAUs)
- S9Slip Sheet
- SASandwich
- SBSquare Mile
- SCSquare Centimeter
- SDSolid Pounds
- SESection
- SFSquare Foot
- SGSegment
- SHSheet
- SISquare Inch
- SJSack
- SKSplit Tanktruck
- SLSleeve
- SMSquare Meter
- SNSquare Rod
- SOSpool
- SPShelf Package
- SQSquare
- SRStrip
- SSSheet-Metric Measure
- STSet
- SU
- SVSkid
- SWSkein
- SXShipment
- SYSquare Yard
- T0Telecommunications Lines in Service
- T1Thousand pounds gross
- T2Thousandths of an Inch
- T3Thousand Pieces
- T4Thousand Bags
- T5Thousand Casings
- T6Thousand Gallons
- T7Thousand Impressions
- T8Thousand Linear Inches
- T9Thousand Kilowatt Hours/Megawatt-Hour
- TATenth Cubic Foot
- TBTube
- TCTruckload
- TDTherms
- TETote
- TFTen Square Yards
- TGGross Ton
- THThousand
- TIThousand Square Inches
- TJThousand Sq. Centimeters
- TKTank
- TLThousand Feet (Linear)
- TMThousand Feet (Board)
- TNNet Ton (2,000 LB).
- TOTroy Ounce
- TPTen-pack
- TQThousand Feet
- TRTen Square Feet
- TSThousand Square Feet
- TTThousand Linear Meters
- TUThousand Linear Yards
- TVThousand Kilograms
- TWThousand Sheets
- TXTroy Pound
- TYTray
- TZThousand Cubic Feet
- U1Treatments
- U2Tablet
- U3Ten
- U5Two Hundred Fifty
- UATorr
- UBTelecommunications Lines in Service - Average
- UCTelecommunications Ports
- UDTenth Minutes
- UETenth Hours
- UFUsage per Telecommunications Line - Average
- UHTen Thousand Yards
- ULUnitless
- UMMillion Units
- UNUnit
- VAVolt-ampere per Kilogram
- VCFive Hundred
- VIVial
- VSVisit
- VT
- W2Wet Kilo
- W4
- WAWatts per Kilogram
- WBWet Pound
- WEWet Ton
- WGWine Gallon
- WHWheel
- WIWeight per Square Inch
- WKWeek
- WMWorking Months
- WPPennyweight
- WRWrap
- WT
- WU
- WWMilliliters of Water
- X1Chains (Land Survey)
- YDYard
- YL100 Lineal Yards
- YRYears
- YTTen Yards
- Z1Lift Van
- Z2Chest
- Z3Cask
- Z4Hogshead
- Z5Lug
- Z6Conference Points
- Z8Newspaper Agate Line
- ZPPage
- ZZMutually Defined
Code qualifying how to extend charges or interpret value.
Codes (120)- AAPercent Of Amount Advanced
- ACPercent Of Amount Of Collection
- AVAd Valorum (Per Cent of Value)
- B0Per Board Feet
- B1Per 100 Board Feet
- BFPer 1,000 Board Feet
- BLBill of Lading Declared Value
- BRPer Barrel
- C5Per 50 Cubic Feet
- CFPer 40 Cubic Feet (Measurement Ton)
- CMPer Cubic Meter
- CPComputer Units
- CSPer Special Charge
- CTCharge or Credit Based on Percentage of Total
- CWPer Hundred Weight
- DDDepartment of Defense Unique Codes
- DPPer $1000
- DRPer Dromedary Service Shipment
- DSPer Hundredweight Per Mile Per Dromedary Service Shipment
- DVPer Day Per Vehicle
- EIEx Parte Increase
- ERPer Each Request
- FCFlat Charge
- FFPercent Of Tariff Rate
- FLPer Flat Bed
- FNPer Two Weeks
- FRFlat Rate
- FTPer Foot
- FVLoaded to Full Visible Capacity
- GTPer Gross Ton
- HDPer Hundredweight Per Dromedary Service Shipment
- HMRate Per Hundred Weight Per Mile
- HNPer Half Month
- HXHundredweight Per Day
- HYPer Half Year
- INPer Inch
- KGPer Kilograms
- KLPer Kiloliter
- KPPer Kilometer
- KTPer Kilotons
- LBPer Pound
- LFPer Loaded 436L Pallet
- LPPer Label
- LRPer Litre
- LSLump Sum
- LTPer Long Ton
- MAMinimum per Service
- MBPer Mile per Service
- MCMinimum Per Car
- MDPer Man Per Day
- MEMultiple Equipment
- MHPer Man Per Hour
- MINegative Charge
- MMPer Metric Ton (Tonne)
- MNMinimum
- MOPer Month
- MPMaximum Per Shipment
- MRPer Mile Per Vehicle Used Per Round Trip
- MSMinimum Per Shipment
- MTPer Permit
- MVPer Mile Per Vehicle (Rail Car) Moved
- MWMinimum Per Vehicle
- MXMixed Shipment Rule
- NDMinimum Per Driver
- NMPer Mile Per Person
- NPMinimum Per Day Per Person
- NVMinimum Per Day Per Vehicle
- P1Per Advancement
- PAPer Container
- PBPer Barge
- PCPer Car
- PDPer Day
- PEPer 20 Foot Equivalent (TEU)
- PFPer Cubic Foot
- PGPer Gallon
- PHPer Hundred (of Basic Unit)
- PKPer Cord
- PLPer Load
- PMPer Mile
- PNPer Night
- PPPer Piece
- PQPer Period
- PRPer Hour
- PSPer Shipment
- PTPer Net Ton
- PUPer Unit
- PVPer Vehicle
- PWPercentage of Charges
- PYPer Gallon Per Mile
- QYPer Quarter Year
- RPPercent Of Rate
- RTPer Vehicle Used Per Round Trip
- S0Per 1000 Square Feet
- S1Per 100 Square Feet
- SCPer Stencil
- SDShipper's Export Declaration Value
- SFPer Square Feet
- SPPer Stop
- STPer Short Ton
- SUPer Stack Car Unit
- SYSquare Yard
- TBPer 2 Trailers Same Day
- TCPer 3 Trailers Same Day
- TDPer 4 Trailers Same Day
- TNPer Train Rate
- TPPer Tag
- TRPer Trailer (Per Train)
- VAPer Vehicle Moved
- VHPer Vehicle Used
- VMVolume
- VPMaximum Per Vehicle
- VRPer Rail Car Used
- VSVarious
- VTPer Mile per Vehicle
- VUPer Mile Per Vehicle (Rail Car) Used
- VVPer Vehicle per State
- WKPer Week
- WMWeight or Measurement
- XPMaximum Per Person
- YRPer Year
Code to qualify percent.
Codes (32)- 1Lease Rate Factor
- 2Early Termination Rate
- 3Renewal Rate
- 4Renewal Rate Cap
- 10Complete
- 11Remaining
- 14Availability Factor
- 15Efficiency Factor
- 16Scrap or Rework Yield
- 17Physical (Percent) Completed
- 18Percent of Value
- 19Premium Rate
- 05Target Fee or Profit
- 06Current Schedule Variance
- 07Current Cost Variance
- 08Cumulative Schedule Variance
- 09Cumulative Cost Variance
- ANAnnual Limit
- DFDecrement Factor
- DYPer Day Limit
- EFEscalation Factor
- KAVariation in Quantity Over
- KBVariation in Quantity Under
- LMLimit
- MNMonthly Limit
- PFPer Person Deductible
- PHPer Occurrence Deductible
- PMPer Person Monthly Limit
- PNPer Occurrence Monthly Limit
- PPPer Person Limit
- PRPer Occurrence Limit
- WKPer Week Limit
Code specifying type of date or time, or both date and time.
Codes (601)- 100No Shipping Schedule Established as of
- 101No Production Schedule Established as of
- 102Issue
- 103Award
- 104System Survey
- 105Quality Rating
- 106Required By
- 107Deposit
- 108Postmark
- 109Received at Lockbox
- 110Originally Scheduled Ship
- 111Manifest/Ship Notice
- 112Buyers Dock
- 113Sample Required
- 114Tooling Required
- 115Sample Available
- 116Scheduled Interchange Delivery
- 118Requested Pickup
- 119Test Performed
- 120Control Plan
- 121Feasibility Sign Off
- 122Failure Mode Effective
- 124Group Contract Effective
- 125Group Contract Expiration
- 126Wholesale Contract Effective
- 127Wholesale Contract Expiration
- 128Replacement Effective
- 129Customer Contract Effective
- 130Customer Contract Expiration
- 131Item Contract Effective
- 132Item Contract Expiration
- 133Accounts Receivable - Statement Date
- 134Ready for Inspection
- 135Booking
- 136Technical Rating
- 137Delivery Rating
- 138Commercial Rating
- 139Estimated
- 140Actual
- 141Assigned
- 142Loss
- 143Due Date of First Payment to Principal and Interest
- 144Estimated Acceptance
- 145Opening Date
- 146Closing Date
- 147Due Date Last Complete Installment Paid
- 148Date of Local Office Approval of Conveyance of Damaged Real Estate Property
- 149Date Deed Filed for Record
- 150Service Period Start
- 151Service Period End
- 152Effective Date of Change
- 153Service Interruption
- 154Adjustment Period Start
- 155Adjustment Period End
- 156Allotment Period Start
- 157Test Period Start
- 158Test Period Ending
- 159Bid Price Exception
- 160Samples to be Returned By
- 161Loaded on Vessel
- 162Pending Archive
- 163Actual Archive
- 164First Issue
- 165Final Issue
- 166Message
- 167Most Recent Revision (or Initial Version)
- 168Release
- 169Product Availability Date
- 170Supplemental Issue
- 171Revision
- 172Correction
- 173Week Ending
- 174Month Ending
- 175Cancel if not shipped by
- 176Expedited on
- 177Cancellation
- 178Hold (as of)
- 179Hold as Stock (as of)
- 180No Promise (as of)
- 181Stop Work (as of)
- 182Will Advise (as of)
- 183Connection
- 184Inventory
- 185Vessel Registry
- 186Invoice Period Start
- 187Invoice Period End
- 188Credit Advice
- 189Debit Advice
- 190Released to Vessel
- 191Material Specification
- 192Delivery Ticket
- 193Period Start
- 194Period End
- 195Contract Re-Open
- 196Start
- 197End
- 198Completion
- 199Seal
- 200Assembly Start
- 201Acceptance
- 202Master Lease Agreement
- 203First Produced
- 204Official Rail Car Interchange (Either Actual or Agreed Upon)
- 206Status (Outside Processor)
- 207Status (Commercial)
- 208Lot Number Expiration
- 209Contract Performance Start
- 210Contract Performance Delivery
- 211Service Requested
- 212Returned to Customer
- 213Adjustment to Bill Dated
- 214Date of Repair/Service
- 215Interruption Start
- 216Interruption End
- 217Spud
- 218Initial Completion
- 219Plugged and Abandoned
- 220Penalty
- 221Penalty Begin
- 222Birth
- 223Birth Certificate
- 224Adoption
- 225Christening
- 226Lease Commencement
- 227Lease Term Start
- 228Lease Term End
- 229Rent Start
- 230Installation
- 231Progress Payment
- 232Claim Statement Period Start
- 233Claim Statement Period End
- 234Settlement Date
- 235Delayed Billing (Not Delayed Payment)
- 236Lender Credit Check
- 237Student Signed
- 238Schedule Release
- 239Baseline
- 240Baseline Start
- 241Baseline Complete
- 242Actual Start
- 243Actual Complete
- 244Estimated Start
- 245Estimated Completion
- 246Start no earlier than
- 247Start no later than
- 248Finish no later than
- 249Finish no earlier than
- 250Mandatory (or Target) Start
- 251Mandatory (or Target) Finish
- 252Early Start
- 253Early Finish
- 254Late Start
- 255Late Finish
- 256Scheduled Start
- 257Scheduled Finish
- 258Original Early Start
- 259Original Early Finish
- 260Rest Day
- 261Rest Start
- 262Rest Finish
- 263Holiday
- 264Holiday Start
- 265Holiday Finish
- 266Base
- 267Timenow
- 268End Date of Support
- 269Date Account Matures
- 270Date Filed
- 271Penalty End
- 272Exit Plant Date
- 273Latest On Board Carrier Date
- 274Requested Departure Date
- 275Approved
- 276Contract Start
- 277Contract Definition
- 278Last Item Delivery
- 279Contract Completion
- 280Date Course of Orthodontics Treatment Began or is Expected to Begin
- 281Over Target Baseline Month
- 282Previous Report
- 283Funds Appropriation - Start
- 284Funds Appropriation - End
- 285Employment or Hire
- 286Retirement
- 287Medicare
- 288Consolidated Omnibus Budget Reconciliation Act (COBRA)
- 289Premium Paid to Date
- 290Coordination of Benefits
- 291Plan
- 292Benefit
- 293Education
- 294Earnings Effective Date
- 295Primary Care Provider
- 296Initial Disability Period Return To Work
- 297Initial Disability Period Last Day Worked
- 298Latest Absence
- 299Illness
- 300Enrollment Signature Date
- 301Consolidated Omnibus Budget Reconciliation Act (COBRA) Qualifying Event
- 302Maintenance
- 303Maintenance Effective
- 304Latest Visit or Consultation
- 305Net Credit Service Date
- 306Adjustment Effective Date
- 307Eligibility
- 309Plan Termination
- 310Date of Closing
- 311Latest Receiving Date/Cutoff Date
- 312Salary Deferral
- 313Cycle
- 314Disability
- 315Offset
- 316Prior Incorrect Date of Birth
- 317Corrected Date of Birth
- 319Failed
- 320Date Foreclosure Proceedings Instituted
- 321Purchased
- 322Put into Service
- 323Replaced
- 324Returned
- 327Quarter Ending
- 328Changed
- 329Terminated
- 330Referral Date
- 331Evaluation Date
- 332Placement Date
- 333Individual Education Plan (IEP)
- 334Re-evaluation Date
- 335Dismissal Date
- 336Employment Begin
- 337Employment End
- 338Medicare Begin
- 339Medicare End
- 340Consolidated Omnibus Budget Reconciliation Act (COBRA) Begin
- 341Consolidated Omnibus Budget Reconciliation Act (COBRA) End
- 342Premium Paid to Date Begin
- 343Premium Paid to Date End
- 344Coordination of Benefits Begin
- 345Coordination of Benefits End
- 346Plan Begin
- 347Plan End
- 348Benefit Begin
- 349Benefit End
- 350Education Begin
- 351Education End
- 352Primary Care Provider Begin
- 353Primary Care Provider End
- 354Illness Begin
- 355Illness End
- 356Eligibility Begin
- 357Eligibility End
- 358Cycle Begin
- 359Cycle End
- 360Initial Disability Period Start
- 361Initial Disability Period End
- 362Offset Begin
- 363Offset End
- 364Plan Period Election Begin
- 365Plan Period Election End
- 366Plan Period Election
- 367Due to Customer
- 368Submittal
- 369Estimated Departure Date
- 370Actual Departure Date
- 371Estimated Arrival Date
- 372Actual Arrival Date
- 373Order Start
- 374Order End
- 375Delivery Start
- 376Delivery End
- 377Contract Costs Through
- 378Financial Information Submission
- 379Business Termination
- 380Applicant Signed
- 381Cosigner Signed
- 382Enrollment
- 383Adjusted Hire
- 384Credited Service
- 385Credited Service Begin
- 386Credited Service End
- 387Deferred Distribution
- 388Payment Commencement
- 389Payroll Period
- 390Payroll Period Begin
- 391Payroll Period End
- 392Plan Entry
- 393Plan Participation Suspension
- 394Rehire
- 395Retermination
- 396Termination
- 397Valuation
- 398Vesting Service
- 399Vesting Service Begin
- 400Vesting Service End
- 401Duplicate Bill
- 402Adjustment Promised
- 403Adjustment Processed
- 404Year Ending
- 405Production
- 406Material Classification
- 408Weighed
- 409Date of Deed in Lieu
- 410Date of Firm Commitment
- 411Expiration Date of Extension to Foreclose
- 412Date of Notice to Convey
- 413Date of Release of Bankruptcy
- 414Optimistic Early Start
- 415Optimistic Early Finish
- 416Optimistic Late Start
- 417Optimistic Late Finish
- 418Most Likely Early Start
- 419Most Likely Early Finish
- 420Most Likely Late Start
- 421Most Likely Late Finish
- 422Pessimistic Early Start
- 423Pessimistic Early Finish
- 424Pessimistic Late Start
- 425Pessimistic Late Finish
- 426First Payment Due
- 427First Interest Payment Due
- 428Subsequent Interest Payment Due
- 429Irregular Interest Payment Due
- 430Guarantor Received
- 431Onset of Current Symptoms or Illness
- 432Submission
- 434Statement
- 435Admission
- 436Insurance Card
- 437Spouse Retirement
- 438Onset of Similar Symptoms or Illness
- 439Accident
- 440Release of Information
- 441Prior Placement
- 442Date of Death
- 443Peer Review Organization (PRO) Approved Stay
- 444First Visit or Consultation
- 445Initial Placement
- 446Replacement
- 447Occurrence
- 448Occurrence Span
- 449Occurrence Span From
- 450Occurrence Span To
- 451Initial Fee Due
- 452Appliance Placement
- 453Acute Manifestation of a Chronic Condition
- 454Initial Treatment
- 455Last X-Ray
- 456Surgery
- 457Continuous Passive Motion (CPM)
- 458Certification
- 459Nursing Home From
- 460Nursing Home To
- 461Last Certification
- 462Date of Local Office Approval of Conveyance of Occupied Real Estate Property
- 463Begin Therapy
- 464Oxygen Therapy From
- 465Oxygen Therapy To
- 466Oxygen Therapy
- 467Signature
- 468Prescription Fill
- 469Provider Signature
- 470Date of Local Office Certification of Conveyance of Damaged Real Estate Property
- 471Prescription
- 472Service
- 473Medicaid Begin
- 474Medicaid End
- 475Medicaid
- 476Peer Review Organization (PRO) Approved Stay From
- 477Peer Review Organization (PRO) Approved Stay To
- 478Prescription From
- 479Prescription To
- 480Arterial Blood Gas Test
- 481Oxygen Saturation Test
- 482Pregnancy Begin
- 483Pregnancy End
- 484Last Menstrual Period
- 485Injury Begin
- 486Injury End
- 487Nursing Home
- 488Collateral Dependent
- 489Collateral Dependent Begin
- 490Collateral Dependent End
- 491Sponsored Dependent
- 492Sponsored Dependent Begin
- 493Sponsored Dependent End
- 494Deductible
- 495Out-of-Pocket
- 496Contract Audit Date
- 497Latest Delivery Date at Pier
- 498Mortgagee Reported Curtailment Date
- 499Mortgagee Official Signature Date
- 500Resubmission
- 501Expected Reply
- 502Dropped to Less than Half Time
- 503Repayment Begin
- 504Loan Servicing Transfer
- 505Loan Purchase
- 506Last Notification
- 507Extract
- 508Extended
- 509Servicer Signature Date
- 510Date Packed
- 511Shelf Life Expiration
- 512Warranty Expiration
- 513Overhauled
- 514Transferred
- 515Notified
- 516Discovered
- 517Inspected
- 518Voucher (Date of)
- 519Date Bankruptcy Filed
- 520Date of Damage
- 521Date Hazard Insurance Policy Cancelled
- 522Expiration Date to Submit Title Evidence
- 523Date of Claim
- 524Date of Notice of Referral for Assignment
- 525Date of Notice of Probable Ineligibility for Assignment
- 526Date of Foreclosure Notice
- 527Expiration of Foreclosure Timeframe
- 528Date Possessory Action Initiated
- 529Date of Possession
- 531Date of Acquisition of Title
- 532Expiration of Extension to Convey
- 533Date of Assignment Approval
- 534Date of Assignment Rejection
- 535Curtailment Date from Advice of Payment
- 536Expiration of Extension to Submit Fiscal Data
- 537Date Documentation, or Paperwork, or Both Was Sent
- 538Makegood Commercial Date
- 539Policy Effective
- 540Policy Expiration
- 541Employee Effective Date of Coverage
- 542Claim Administrator Notified of Employee Legal Representation
- 543Last Premium Paid Date
- 544Employer Knowledge of the Injury
- 545Claim Administrator Knowledge of the Injury
- 546Date of Maximum Medical Improvement
- 547Date of Loan
- 548Date of Advance
- 549Beginning Lay Date
- 550Certificate Effective
- 551Benefit Application Date
- 552Actual Return to Work
- 553Released Return to Work
- 554Ending Lay Date
- 555Employee Wages Ceased
- 556Last Salary Increase
- 557Employee Laid Off
- 558Injury or Illness
- 559Oldest Unpaid Installment
- 560Preforeclosure Acceptance Date
- 561Preforeclosure Sale Closing Date
- 562Date of First Uncured Default
- 563Date Default Was Cured
- 564Date of First Mortgage Payment
- 565Date of Property Inspection
- 566Date Total Amount of Delinquency Reported
- 567Date Outstanding Loan Balance Reported
- 568Date Foreclosure Sale Scheduled
- 569Date Foreclosure Held
- 570Date Redemption Period Ends
- 571Date Voluntary Conveyance Accepted
- 572Date Property Sold
- 573Date Claim Paid
- 574Action Begin Date
- 575Projected Action End Date
- 576Action End Date
- 577Original Maturity Date
- 578Date Referred to Attorney for Foreclosure
- 579Planned Release
- 580Actual Release
- 581Contract Period
- 582Report Period
- 583Suspension
- 584Reinstatement
- 585Report
- 586First Contact
- 587Projected Foreclosure Sale Date
- 589Date Assignment Filed for Record
- 590Date of Appraisal
- 591Expiration Date of Extension to Assign
- 592Date of Extension to Convey
- 593Date Hazard Insurance Policy Refused
- 594High Fabrication Release Authorization
- 595High Raw Material Authorization
- 596Material Change Notice
- 597Latest Delivery Date at Rail Ramp
- 598Rejected
- 600As Of
- 601First Submission
- 602Subsequent Submission
- 700Override Date for Settlement
- 701Settlement Date (From Interline Settlement System (ISS) only)
- 702Sending Road Time Stamp
- 703Retransmission Time Stamp
- 704Delivery Appointment Date and Time
- 706Date Material Usage Suspended
- 993Request for Quotation
- 994Quote
- 996Required Delivery
- 997Quote to be Received By
- 001Cancel After
- 002Delivery Requested
- 003Invoice
- 004Purchase Order
- 005Sailing
- 006Sold
- 007Effective
- 008Purchase Order Received
- 009Process
- 010Requested Ship
- 011Shipped
- 012Terms Discount Due
- 013Terms Net Due
- 014Deferred Payment
- 015Promotion Start
- 016Promotion End
- 017Estimated Delivery
- 018Available
- 019Unloaded
- 020Check
- 021Charge Back
- 022Freight Bill
- 023Promotion Order - Start
- 024Promotion Order - End
- 025Promotion Ship - Start
- 026Promotion Ship - End
- 027Promotion Requested Delivery - Start
- 028Promotion Requested Delivery - End
- 029Promotion Performance - Start
- 030Promotion Performance - End
- 031Promotion Invoice Performance - Start
- 032Promotion Invoice Performance - End
- 033Promotion Floor Stock Protect - Start
- 034Promotion Floor Stock Protect - End
- 035Delivered
- 036Expiration
- 037Ship Not Before
- 038Ship No Later
- 039Ship Week of
- 040Status (After and Including)
- 041Status (Prior and Including)
- 042Superseded
- 043Publication
- 044Settlement Date as Specified by the Originator
- 045Endorsement Date
- 046Field Failure
- 047Functional Test
- 048System Test
- 049Prototype Test
- 050Received
- 051Cumulative Quantity Start
- 052Cumulative Quantity End
- 053Buyers Local
- 054Sellers Local
- 055Confirmed
- 056Estimated Port of Entry
- 057Actual Port of Entry
- 058Customs Clearance
- 059Inland Ship
- 060Engineering Change Level
- 061Cancel if Not Delivered by
- 062Blueprint
- 063Do Not Deliver After
- 064Do Not Deliver Before
- 0651st Schedule Delivery
- 0661st Schedule Ship
- 067Current Schedule Delivery
- 068Current Schedule Ship
- 069Promised for Delivery
- 070Scheduled for Delivery (After and Including)
- 071Requested for Delivery (After and Including)
- 072Promised for Delivery (After and Including)
- 073Scheduled for Delivery (Prior to and Including)
- 074Requested for Delivery (Prior to and Including)
- 075Promised for Delivery (Prior to and Including)
- 076Scheduled for Delivery (Week of)
- 077Requested for Delivery (Week of)
- 078Promised for Delivery (Week of)
- 079Promised for Shipment
- 080Scheduled for Shipment (After and Including)
- 081Requested for Shipment (After and Including)
- 082Promised for Shipment (After and Including)
- 083Scheduled for Shipment (Prior to and Including)
- 084Requested for Shipment (Prior to and Including)
- 085Promised for Shipment (Prior to and Including)
- 086Scheduled for Shipment (Week of)
- 087Requested for Shipment (Week of)
- 088Promised for Shipment (Week of)
- 089Inquiry
- 090Report Start
- 091Report End
- 092Contract Effective
- 093Contract Expiration
- 094Manufacture
- 095Bill of Lading
- 096Discharge
- 097Transaction Creation
- 098Bid (Effective)
- 099Bid Open (Date Bids Will Be Opened)
- ZZZMutually Defined
Code specifying type of date or time, or both date and time.
Codes (601)- 100No Shipping Schedule Established as of
- 101No Production Schedule Established as of
- 102Issue
- 103Award
- 104System Survey
- 105Quality Rating
- 106Required By
- 107Deposit
- 108Postmark
- 109Received at Lockbox
- 110Originally Scheduled Ship
- 111Manifest/Ship Notice
- 112Buyers Dock
- 113Sample Required
- 114Tooling Required
- 115Sample Available
- 116Scheduled Interchange Delivery
- 118Requested Pickup
- 119Test Performed
- 120Control Plan
- 121Feasibility Sign Off
- 122Failure Mode Effective
- 124Group Contract Effective
- 125Group Contract Expiration
- 126Wholesale Contract Effective
- 127Wholesale Contract Expiration
- 128Replacement Effective
- 129Customer Contract Effective
- 130Customer Contract Expiration
- 131Item Contract Effective
- 132Item Contract Expiration
- 133Accounts Receivable - Statement Date
- 134Ready for Inspection
- 135Booking
- 136Technical Rating
- 137Delivery Rating
- 138Commercial Rating
- 139Estimated
- 140Actual
- 141Assigned
- 142Loss
- 143Due Date of First Payment to Principal and Interest
- 144Estimated Acceptance
- 145Opening Date
- 146Closing Date
- 147Due Date Last Complete Installment Paid
- 148Date of Local Office Approval of Conveyance of Damaged Real Estate Property
- 149Date Deed Filed for Record
- 150Service Period Start
- 151Service Period End
- 152Effective Date of Change
- 153Service Interruption
- 154Adjustment Period Start
- 155Adjustment Period End
- 156Allotment Period Start
- 157Test Period Start
- 158Test Period Ending
- 159Bid Price Exception
- 160Samples to be Returned By
- 161Loaded on Vessel
- 162Pending Archive
- 163Actual Archive
- 164First Issue
- 165Final Issue
- 166Message
- 167Most Recent Revision (or Initial Version)
- 168Release
- 169Product Availability Date
- 170Supplemental Issue
- 171Revision
- 172Correction
- 173Week Ending
- 174Month Ending
- 175Cancel if not shipped by
- 176Expedited on
- 177Cancellation
- 178Hold (as of)
- 179Hold as Stock (as of)
- 180No Promise (as of)
- 181Stop Work (as of)
- 182Will Advise (as of)
- 183Connection
- 184Inventory
- 185Vessel Registry
- 186Invoice Period Start
- 187Invoice Period End
- 188Credit Advice
- 189Debit Advice
- 190Released to Vessel
- 191Material Specification
- 192Delivery Ticket
- 193Period Start
- 194Period End
- 195Contract Re-Open
- 196Start
- 197End
- 198Completion
- 199Seal
- 200Assembly Start
- 201Acceptance
- 202Master Lease Agreement
- 203First Produced
- 204Official Rail Car Interchange (Either Actual or Agreed Upon)
- 206Status (Outside Processor)
- 207Status (Commercial)
- 208Lot Number Expiration
- 209Contract Performance Start
- 210Contract Performance Delivery
- 211Service Requested
- 212Returned to Customer
- 213Adjustment to Bill Dated
- 214Date of Repair/Service
- 215Interruption Start
- 216Interruption End
- 217Spud
- 218Initial Completion
- 219Plugged and Abandoned
- 220Penalty
- 221Penalty Begin
- 222Birth
- 223Birth Certificate
- 224Adoption
- 225Christening
- 226Lease Commencement
- 227Lease Term Start
- 228Lease Term End
- 229Rent Start
- 230Installation
- 231Progress Payment
- 232Claim Statement Period Start
- 233Claim Statement Period End
- 234Settlement Date
- 235Delayed Billing (Not Delayed Payment)
- 236Lender Credit Check
- 237Student Signed
- 238Schedule Release
- 239Baseline
- 240Baseline Start
- 241Baseline Complete
- 242Actual Start
- 243Actual Complete
- 244Estimated Start
- 245Estimated Completion
- 246Start no earlier than
- 247Start no later than
- 248Finish no later than
- 249Finish no earlier than
- 250Mandatory (or Target) Start
- 251Mandatory (or Target) Finish
- 252Early Start
- 253Early Finish
- 254Late Start
- 255Late Finish
- 256Scheduled Start
- 257Scheduled Finish
- 258Original Early Start
- 259Original Early Finish
- 260Rest Day
- 261Rest Start
- 262Rest Finish
- 263Holiday
- 264Holiday Start
- 265Holiday Finish
- 266Base
- 267Timenow
- 268End Date of Support
- 269Date Account Matures
- 270Date Filed
- 271Penalty End
- 272Exit Plant Date
- 273Latest On Board Carrier Date
- 274Requested Departure Date
- 275Approved
- 276Contract Start
- 277Contract Definition
- 278Last Item Delivery
- 279Contract Completion
- 280Date Course of Orthodontics Treatment Began or is Expected to Begin
- 281Over Target Baseline Month
- 282Previous Report
- 283Funds Appropriation - Start
- 284Funds Appropriation - End
- 285Employment or Hire
- 286Retirement
- 287Medicare
- 288Consolidated Omnibus Budget Reconciliation Act (COBRA)
- 289Premium Paid to Date
- 290Coordination of Benefits
- 291Plan
- 292Benefit
- 293Education
- 294Earnings Effective Date
- 295Primary Care Provider
- 296Initial Disability Period Return To Work
- 297Initial Disability Period Last Day Worked
- 298Latest Absence
- 299Illness
- 300Enrollment Signature Date
- 301Consolidated Omnibus Budget Reconciliation Act (COBRA) Qualifying Event
- 302Maintenance
- 303Maintenance Effective
- 304Latest Visit or Consultation
- 305Net Credit Service Date
- 306Adjustment Effective Date
- 307Eligibility
- 309Plan Termination
- 310Date of Closing
- 311Latest Receiving Date/Cutoff Date
- 312Salary Deferral
- 313Cycle
- 314Disability
- 315Offset
- 316Prior Incorrect Date of Birth
- 317Corrected Date of Birth
- 319Failed
- 320Date Foreclosure Proceedings Instituted
- 321Purchased
- 322Put into Service
- 323Replaced
- 324Returned
- 327Quarter Ending
- 328Changed
- 329Terminated
- 330Referral Date
- 331Evaluation Date
- 332Placement Date
- 333Individual Education Plan (IEP)
- 334Re-evaluation Date
- 335Dismissal Date
- 336Employment Begin
- 337Employment End
- 338Medicare Begin
- 339Medicare End
- 340Consolidated Omnibus Budget Reconciliation Act (COBRA) Begin
- 341Consolidated Omnibus Budget Reconciliation Act (COBRA) End
- 342Premium Paid to Date Begin
- 343Premium Paid to Date End
- 344Coordination of Benefits Begin
- 345Coordination of Benefits End
- 346Plan Begin
- 347Plan End
- 348Benefit Begin
- 349Benefit End
- 350Education Begin
- 351Education End
- 352Primary Care Provider Begin
- 353Primary Care Provider End
- 354Illness Begin
- 355Illness End
- 356Eligibility Begin
- 357Eligibility End
- 358Cycle Begin
- 359Cycle End
- 360Initial Disability Period Start
- 361Initial Disability Period End
- 362Offset Begin
- 363Offset End
- 364Plan Period Election Begin
- 365Plan Period Election End
- 366Plan Period Election
- 367Due to Customer
- 368Submittal
- 369Estimated Departure Date
- 370Actual Departure Date
- 371Estimated Arrival Date
- 372Actual Arrival Date
- 373Order Start
- 374Order End
- 375Delivery Start
- 376Delivery End
- 377Contract Costs Through
- 378Financial Information Submission
- 379Business Termination
- 380Applicant Signed
- 381Cosigner Signed
- 382Enrollment
- 383Adjusted Hire
- 384Credited Service
- 385Credited Service Begin
- 386Credited Service End
- 387Deferred Distribution
- 388Payment Commencement
- 389Payroll Period
- 390Payroll Period Begin
- 391Payroll Period End
- 392Plan Entry
- 393Plan Participation Suspension
- 394Rehire
- 395Retermination
- 396Termination
- 397Valuation
- 398Vesting Service
- 399Vesting Service Begin
- 400Vesting Service End
- 401Duplicate Bill
- 402Adjustment Promised
- 403Adjustment Processed
- 404Year Ending
- 405Production
- 406Material Classification
- 408Weighed
- 409Date of Deed in Lieu
- 410Date of Firm Commitment
- 411Expiration Date of Extension to Foreclose
- 412Date of Notice to Convey
- 413Date of Release of Bankruptcy
- 414Optimistic Early Start
- 415Optimistic Early Finish
- 416Optimistic Late Start
- 417Optimistic Late Finish
- 418Most Likely Early Start
- 419Most Likely Early Finish
- 420Most Likely Late Start
- 421Most Likely Late Finish
- 422Pessimistic Early Start
- 423Pessimistic Early Finish
- 424Pessimistic Late Start
- 425Pessimistic Late Finish
- 426First Payment Due
- 427First Interest Payment Due
- 428Subsequent Interest Payment Due
- 429Irregular Interest Payment Due
- 430Guarantor Received
- 431Onset of Current Symptoms or Illness
- 432Submission
- 434Statement
- 435Admission
- 436Insurance Card
- 437Spouse Retirement
- 438Onset of Similar Symptoms or Illness
- 439Accident
- 440Release of Information
- 441Prior Placement
- 442Date of Death
- 443Peer Review Organization (PRO) Approved Stay
- 444First Visit or Consultation
- 445Initial Placement
- 446Replacement
- 447Occurrence
- 448Occurrence Span
- 449Occurrence Span From
- 450Occurrence Span To
- 451Initial Fee Due
- 452Appliance Placement
- 453Acute Manifestation of a Chronic Condition
- 454Initial Treatment
- 455Last X-Ray
- 456Surgery
- 457Continuous Passive Motion (CPM)
- 458Certification
- 459Nursing Home From
- 460Nursing Home To
- 461Last Certification
- 462Date of Local Office Approval of Conveyance of Occupied Real Estate Property
- 463Begin Therapy
- 464Oxygen Therapy From
- 465Oxygen Therapy To
- 466Oxygen Therapy
- 467Signature
- 468Prescription Fill
- 469Provider Signature
- 470Date of Local Office Certification of Conveyance of Damaged Real Estate Property
- 471Prescription
- 472Service
- 473Medicaid Begin
- 474Medicaid End
- 475Medicaid
- 476Peer Review Organization (PRO) Approved Stay From
- 477Peer Review Organization (PRO) Approved Stay To
- 478Prescription From
- 479Prescription To
- 480Arterial Blood Gas Test
- 481Oxygen Saturation Test
- 482Pregnancy Begin
- 483Pregnancy End
- 484Last Menstrual Period
- 485Injury Begin
- 486Injury End
- 487Nursing Home
- 488Collateral Dependent
- 489Collateral Dependent Begin
- 490Collateral Dependent End
- 491Sponsored Dependent
- 492Sponsored Dependent Begin
- 493Sponsored Dependent End
- 494Deductible
- 495Out-of-Pocket
- 496Contract Audit Date
- 497Latest Delivery Date at Pier
- 498Mortgagee Reported Curtailment Date
- 499Mortgagee Official Signature Date
- 500Resubmission
- 501Expected Reply
- 502Dropped to Less than Half Time
- 503Repayment Begin
- 504Loan Servicing Transfer
- 505Loan Purchase
- 506Last Notification
- 507Extract
- 508Extended
- 509Servicer Signature Date
- 510Date Packed
- 511Shelf Life Expiration
- 512Warranty Expiration
- 513Overhauled
- 514Transferred
- 515Notified
- 516Discovered
- 517Inspected
- 518Voucher (Date of)
- 519Date Bankruptcy Filed
- 520Date of Damage
- 521Date Hazard Insurance Policy Cancelled
- 522Expiration Date to Submit Title Evidence
- 523Date of Claim
- 524Date of Notice of Referral for Assignment
- 525Date of Notice of Probable Ineligibility for Assignment
- 526Date of Foreclosure Notice
- 527Expiration of Foreclosure Timeframe
- 528Date Possessory Action Initiated
- 529Date of Possession
- 531Date of Acquisition of Title
- 532Expiration of Extension to Convey
- 533Date of Assignment Approval
- 534Date of Assignment Rejection
- 535Curtailment Date from Advice of Payment
- 536Expiration of Extension to Submit Fiscal Data
- 537Date Documentation, or Paperwork, or Both Was Sent
- 538Makegood Commercial Date
- 539Policy Effective
- 540Policy Expiration
- 541Employee Effective Date of Coverage
- 542Claim Administrator Notified of Employee Legal Representation
- 543Last Premium Paid Date
- 544Employer Knowledge of the Injury
- 545Claim Administrator Knowledge of the Injury
- 546Date of Maximum Medical Improvement
- 547Date of Loan
- 548Date of Advance
- 549Beginning Lay Date
- 550Certificate Effective
- 551Benefit Application Date
- 552Actual Return to Work
- 553Released Return to Work
- 554Ending Lay Date
- 555Employee Wages Ceased
- 556Last Salary Increase
- 557Employee Laid Off
- 558Injury or Illness
- 559Oldest Unpaid Installment
- 560Preforeclosure Acceptance Date
- 561Preforeclosure Sale Closing Date
- 562Date of First Uncured Default
- 563Date Default Was Cured
- 564Date of First Mortgage Payment
- 565Date of Property Inspection
- 566Date Total Amount of Delinquency Reported
- 567Date Outstanding Loan Balance Reported
- 568Date Foreclosure Sale Scheduled
- 569Date Foreclosure Held
- 570Date Redemption Period Ends
- 571Date Voluntary Conveyance Accepted
- 572Date Property Sold
- 573Date Claim Paid
- 574Action Begin Date
- 575Projected Action End Date
- 576Action End Date
- 577Original Maturity Date
- 578Date Referred to Attorney for Foreclosure
- 579Planned Release
- 580Actual Release
- 581Contract Period
- 582Report Period
- 583Suspension
- 584Reinstatement
- 585Report
- 586First Contact
- 587Projected Foreclosure Sale Date
- 589Date Assignment Filed for Record
- 590Date of Appraisal
- 591Expiration Date of Extension to Assign
- 592Date of Extension to Convey
- 593Date Hazard Insurance Policy Refused
- 594High Fabrication Release Authorization
- 595High Raw Material Authorization
- 596Material Change Notice
- 597Latest Delivery Date at Rail Ramp
- 598Rejected
- 600As Of
- 601First Submission
- 602Subsequent Submission
- 700Override Date for Settlement
- 701Settlement Date (From Interline Settlement System (ISS) only)
- 702Sending Road Time Stamp
- 703Retransmission Time Stamp
- 704Delivery Appointment Date and Time
- 706Date Material Usage Suspended
- 993Request for Quotation
- 994Quote
- 996Required Delivery
- 997Quote to be Received By
- 001Cancel After
- 002Delivery Requested
- 003Invoice
- 004Purchase Order
- 005Sailing
- 006Sold
- 007Effective
- 008Purchase Order Received
- 009Process
- 010Requested Ship
- 011Shipped
- 012Terms Discount Due
- 013Terms Net Due
- 014Deferred Payment
- 015Promotion Start
- 016Promotion End
- 017Estimated Delivery
- 018Available
- 019Unloaded
- 020Check
- 021Charge Back
- 022Freight Bill
- 023Promotion Order - Start
- 024Promotion Order - End
- 025Promotion Ship - Start
- 026Promotion Ship - End
- 027Promotion Requested Delivery - Start
- 028Promotion Requested Delivery - End
- 029Promotion Performance - Start
- 030Promotion Performance - End
- 031Promotion Invoice Performance - Start
- 032Promotion Invoice Performance - End
- 033Promotion Floor Stock Protect - Start
- 034Promotion Floor Stock Protect - End
- 035Delivered
- 036Expiration
- 037Ship Not Before
- 038Ship No Later
- 039Ship Week of
- 040Status (After and Including)
- 041Status (Prior and Including)
- 042Superseded
- 043Publication
- 044Settlement Date as Specified by the Originator
- 045Endorsement Date
- 046Field Failure
- 047Functional Test
- 048System Test
- 049Prototype Test
- 050Received
- 051Cumulative Quantity Start
- 052Cumulative Quantity End
- 053Buyers Local
- 054Sellers Local
- 055Confirmed
- 056Estimated Port of Entry
- 057Actual Port of Entry
- 058Customs Clearance
- 059Inland Ship
- 060Engineering Change Level
- 061Cancel if Not Delivered by
- 062Blueprint
- 063Do Not Deliver After
- 064Do Not Deliver Before
- 0651st Schedule Delivery
- 0661st Schedule Ship
- 067Current Schedule Delivery
- 068Current Schedule Ship
- 069Promised for Delivery
- 070Scheduled for Delivery (After and Including)
- 071Requested for Delivery (After and Including)
- 072Promised for Delivery (After and Including)
- 073Scheduled for Delivery (Prior to and Including)
- 074Requested for Delivery (Prior to and Including)
- 075Promised for Delivery (Prior to and Including)
- 076Scheduled for Delivery (Week of)
- 077Requested for Delivery (Week of)
- 078Promised for Delivery (Week of)
- 079Promised for Shipment
- 080Scheduled for Shipment (After and Including)
- 081Requested for Shipment (After and Including)
- 082Promised for Shipment (After and Including)
- 083Scheduled for Shipment (Prior to and Including)
- 084Requested for Shipment (Prior to and Including)
- 085Promised for Shipment (Prior to and Including)
- 086Scheduled for Shipment (Week of)
- 087Requested for Shipment (Week of)
- 088Promised for Shipment (Week of)
- 089Inquiry
- 090Report Start
- 091Report End
- 092Contract Effective
- 093Contract Expiration
- 094Manufacture
- 095Bill of Lading
- 096Discharge
- 097Transaction Creation
- 098Bid (Effective)
- 099Bid Open (Date Bids Will Be Opened)
- ZZZMutually Defined